Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DY-340 MBBR process training platform

Release time:2024-06-30 01:00viewed:times
  • DY-340 MBBR process training platform
1. Scope of application and principle:
MBBR was developed and applied in the mid-1990s. It has the advantages of both traditional fluidized bed and biological contact oxidation, and is a new and efficient sewage
treatment method. So far, MBBR has been used in small-scale, pilot and production experiments for domestic sewage treatment and industrial wastewater treatment abroad , and good results have been achieved.
Among them, the Captor process in the United States and the Linpor process in Germany are currently two relatively mature porous suspended carrier systems. Polyurethane foam blocks are added to the complete mixing reactor for microbial attachment and growth, which
is used to treat urban domestic sewage. Its removal and nitrification of BOD are studied.
The results show that nitrifying bacteria preferentially attach and grow on the carrier, and the nitrification activity reaches 0.33mgN/h•carrier block (carrier volume is 8cm3/block). Within 4h, BOD can be completely removed, and nitrification occurs subsequently, and nitrification can be completed within 10h. In the past 10 years, moving bed biofilm technology has been developed in Norway. Now there are more than 100 sewage treatment plants based on this technology in operation or under construction in 17 countries. They are m*nly used to remove organic matter and ammonia nitrogen from municipal sewage or industrial wastewater.
2. M*n technical indicators and parameters:
1. Ambient temperature: 0.5~40℃
2. Processed water volume: 20 L/h
3. Overall dimensions of the device: 1600 mm×400 mm×1400mm,
4. Working power supply: AC220V±10%, 50Hz, single-phase three-wire system, power 500W, safety protection: with grounding protection, leakage protection, overcurrent protection,
3. M*n configuration
1. 1 raw water tank: white PP board material, thickness 10mm, 400×400×400mm, a dr*n valve is installed on the bottom plate to facilitate the dr*nage of water;
2. 1 clean water tank: white PP board material, thickness 10mm, 300×400×400mm, a dr*n valve is installed on the bottom plate to facilitate the dr*nage of water;
3. Equipped with 1 raw water tank stirring motor , 1 set of 304 st*nless steel stirring paddle; (power 15W, speed 120rpm), (including 1 speed regulator)
4. 1 set of hydrolysis acidification tank, made of transparent organic glass, with a wall thickness of 10mm, 350×300×550mm, cont*ning semi-soft filler
5. 2 sets of MBBR reaction tanks, made of transparent organic glass, with a wall thickness of 10mm, 300×300×500mm, with 2 sets of microporous aeration tubes,
6. 1 set of sedimentation tank, made of transparent organic glass, with a wall thickness of 8mm, Ø250×350mm,
7. 1 set of anti-corrosion lifting magnetic water pump, flow rate: 16~19 (L/min), head: 2.7~3.4 (m), power 20W;
8. 1 set of *r pump, power: 40 W, maximum gas volume: 16L/min,
9. Flow measurement and regulation: 1 water inlet rotor flowmeter: range 6~60L/h;
10. Flow measurement and regulation: 1 gas flowmeter, range 250~2500L/h;
11. Power supply control system: 1 double-sided matte dense pattern spray-coated electric control box, leakage protector (Delixi brand), voltmeter, lockable button switch, wire tube, etc.
12. Matching UPVC connecting pipes and valves (Zhongc* brand).
13. St*nless steel frame test bench (30mm×30mm st*nless steel square tube, with casters as universal wheels with locking feet), etc. a
14. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). Equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selector valve, smoke alarm, fire alarm controller. 3. Principle demonstration: Demonstrate the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with practice module (built-in 3 multiple-choice questions, with prompts for correct and wrong choices)
4. Design and layout: There are 6 multiple-choice questions, each with a score. The correct answer and score will be displayed after submission.
C. Escape drill: Teaching is carried out in the form of fun games. Escape from the burning room within a limited time. Wrong choices will directly enter the score interface.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap