Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

NEWS

NEWS

The principle training device of the oil separation pool

Release time:2024-04-20 22:00viewed:times

The principle tr--ning device of the oil separation pool,Rockwell PLC experimental device


1. Experimental purpose and principle:

The flat oil -type oiling pool uses a high -speed stirring and drug -breaking separation method. The pool surface is equipped with a scratch device.

Floating oil in oil -cont--ning sewage is the m--n part of the oil content in the sewage, and generally accounts for more than 80 % of the total oil content of the sewage. There are very few dissolved oils in sewage, generally not more than 5-15 mg/L. Therefore, the separation of floating oil and emulsification oil is the key to oil -cont--ning sewage treatment.

The meaning of floating oil means that the sewage can take advantage of the poor proportion of oil gr--ns and water to the water surface under the condition of static or slow flow of sewage (usually 2.0 hours). Practice has proved that in the above practice, the particle size that may float to the water surface is generally not less than 60 to 100υ (micrometer). The emergence effect also depends on the proportion of oil, the temperature and viscosity of water.

2. M--n technical indicators and parameters:

1. Environmental temperature: 5 ℃ ~ 40 ℃

2. Treatment of water: 90L/H

3. Water inlet oil content: 150 ~ 500 mg/L

4. Oil content of water out of water: 20 ~ 50 mg/L

5. Inlet water inlet SSS: 150 ~ 300mg/L

6. Water outlet SS: 20 ~ 30 mg/L

7, pH: 6.5 ~ 8.5

8. Device shape size: 1100mm × 450mm × 1700mm

9. Power work Power: AC220V ± 10%, 50Hz, single -phase three -line system, power of 1500W, safety protection: ground protection, leakage protection, overcurrent protection


隔油池实验装置,隔油池原理实训台.jpg


The principle tr--ning device of the oil separation pool,Rockwell PLC experimental device


1 Overview


PLC programming controller tr--ning device sets programmable logic controller, programming software, emulating tr--ning teaching software, tr--ning modules, tr--ning physical objects, electrical tr--ning mesh boards, and electrical component modules. In the device, the basic instruction tr--ning of PLC can be performed intuitively, the simulation and physical control tr--ning of multiple PLC practical applications. The installation host uses a widely used AB5000 series programmable controller. It is equipped with AB series C network communication programming cables, three -phase rat cages, and provides+24V/1A,+5V/1A DC power supply required for tr--ning.


2. Technical performance


1) Enter power supply: three -phase four lines (or three -phase and five lines) ~ 380V ± 10% 50Hz;


2) Working environment: temperature-10 ~+40 relative humidity <85%(25);


3) Device capacity: <500VA;


4) Weight: <110kg;


5) Dimensions: 1680mm × 750mm × 1600mm;


6) Safety protection: It has leakage voltage, leakage current, and overload protection device.


3. Basic configuration and functions of tr--ning devices


1) Configure AB5000 series PLC host, digital amount I/O (32 line digital input, 16 number of digital output), analog I/O (4 simulation input, 4 simulation output), C network communication interface interface , Ethernet communication interface, C network communication programming cable.


2) Tr--ning control screen (iron double -layer sub -light dense -densely pattern spraying structure): Hanging the tr--ning module, built -in slippery, modules can be displaced arbitrarily on the tr--ning screen;


3) Tr--ning table: steel and wood structure. The desktop is made of fire -resistant and wear -resistant materials. It has a tool drawer, keyboard trial, display shelf;


4) Net hole board: clever structure, electrical components are fixed on the mesh board during tr--ning, saving time and effort, flexible and fast;


5) Control cabinet


a. AC power control unit. Three -phase and four -line 380V AC power supply to the device to power the device after the --r switch. The power gauge voltage table monitor the power grid voltage. It is equipped with a lamp fuse protection. The power supply of the control screen is controlled by the key switch and start -off switch. ; Provide a group of three -phase and four -line 380V and single -phase 220V power supply. The output is controlled by the start -stop switch, and a fuse is provided;


DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap