DYLYGZ-5 building power supply and lighting system comprehensive experiment platform
Release time:2024-06-26 20:30viewed:times
1. System Overview
This tr*ning device is used in conjunction with courses related to power supply and distribution systems for intelligent buildings . It conducts teaching and tr*ning on the low-voltage part of power supply and distribution, allowing students to understand the basic structure of power distribution in buildings, become familiar with the power supply and distribution monitoring system, and master the application of power supply and distribution electronic systems in building automation systems . At the same time, it can conduct teaching and tr*ning on lighting power distribution and control, allowing students to understand the basic structure of lighting distribution lines in buildings, become familiar with lighting monitoring systems, and master the application of lighting subsystems in building automation systems. This device can meet the requirements of practical teaching of subjects such as "intelligent buildings", "building electrical ", and "building automation". It is suitable for teaching in various vocational education and tr*ning institutions . 2. System Features 1. The power supply and distribution system and the lighting system can realize real-time dispatching and operation 2. The DDC acquisition control module is used to realize the collection of various data in the power system 3. The advanced LonWorks bus communication protocol is used for networking 4. Equipped with a host computer monitoring system, it can monitor the power supply and distribution network structure in real time, and can also monitor the lighting system and control the lighting line 5. Virtual simulation software for electrical installation of buildings and intelligent buildings Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematics (you can enter the equipment from the schematics). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selector valve, smoke alarm, fire alarm controller. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with practice module (built-in 3 multiple-choice questions, with prompts for correct and incorrect choices) 4. Design layout: There are 6 multiple-choice questions, each with a score. The correct answer and score will be displayed after submission C. Escape drill: Teaching in the form of fun games, escaping from the burning room within a limited time. Wrong choices will directly enter the score interface III. Technical parameters 1. Input power: three-phase four-wire ~ 380V ± 10% 50Hz 2. Ambient temperature: +4℃ ~ +40℃ 3. Device capacity: <5kVA 4. Safety protection: with leakage protection IV. Tr*ning projects Power supply and distribution system part: 1. Instrument equipment tr*ning project (1) Common power supply and distribution equipment recognition and application (2) Power sensor recognition and application 2. Line installation, debugging and operation tr*ning (1) Intelligent building power supply operation line formation and operation (2) Typical floor distribution operation line formation and operation (3) On-site monitoring, meter reading and control of the operation line status in the power supply and distribution system 3. Power supply and distribution automation equipment recognition and operation control tr*ning (1) Standby automatic linkage operation control and debugging (2) Emergency power supply distribution line operation and linkage control (3) Power factor compensation operation control of distribution line 4. Power supply and distribution system comprehensive control operation tr*ning (1) Power supply and distribution monitoring system operation scheduling (2) Linkage control with fire alarm system Lighting system part: 1. Lighting and control equipment recognition and application tr*ning project (1) Recognition and application of common lamps
(2) Illuminance sensor recognition and application
(3) Motion and static detector recognition and application
(4) Remote control lighting controller recognition and application
2. General lighting control circuit installation and debugging tr*ning project
(1) Installation and debugging control of lighting fixtures and general control equipment
(2) Control of emergency lighting equipment
3. Intelligent lighting control circuit installation and debugging tr*ning project
(1) Lighting circuit assembly and control under timetable control mode
(2) Lighting circuit assembly and control under scenario switching control mode
(3) Lighting circuit assembly and control under remote forced control mode
(4) Lighting circuit assembly and control under dynamic control mode
4. Comprehensive dispatching control part
(1) Joint monitoring of power supply and distribution subsystem and lighting subsystem