Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DY-273 CASS Reactor Treatment Training Platform

Release time:2024-06-24 22:00viewed:times
  • DY-273 CASS Reactor Treatment Training Platform
1. Experimental purpose:
Cyclic Activated Sludge System (CASS) is developed on the basis of ICEAS process. It is an improved version of SBR process. It combines biological reaction process and mud-water separation process in one pool. Each cycle consists of the following stages: filling/aeration, filling/sedimentation, skimming, and idle. This process is a cyclic intermittent sewage treatment process with nitrogen and phosphorus removal effects. It has the advantages of traditional SBR treatment process and can effectively inhibit the expansion of filamentous bacteria. It is a teaching demonstration and dynamic experimental equipment of "water inlet and outlet" activated sludge process. Through this experiment
, we hope to achieve the following goals:
1. Understand the characteristics of CASS system;
2. Deepen the understanding of CASS process and operation process.
2. M*n technical indicators and parameters:
1. Ambient temperature: 5℃~40℃
2. Treated water volume: 3~8L/h (average)
3. CASS: residence time: 4.6~14h
4. Secondary sedimentation tank: residence time: 4~1h
5. According to local sewage data:
6. Design inlet and outlet water quality range:
Inlet BOD5 400~800mg/L Outlet 50~100 mg/L
Inlet COD 600~1200mg/L Outlet 100~150 mg/L
Inlet SS 200~400mg/L Outlet 30~40 mg/L
Inlet pH 6~9 Outlet 6~9
7. SBR reaction tank: 650mm×400mm×600mm,
8. Device dimensions: 1200mm×450mm×1500mm,
9. Working power supply: AC220V±10%, 50Hz, single-phase three-wire system, power 500W, safety protection: with grounding protection, leakage protection, overcurrent protection,
III. M*n configuration:
1. 1 raw water tank: white PP board material, thickness 10mm, 500×400×400mm, a dr*n valve is installed on the bottom plate to dr*n the water;
2. 1 clean water tank: white PP board material, thickness 10mm, 200×400×400mm, a dr*n valve is installed on the bottom plate to dr*n the water;
3. Equipped with 1 raw water tank stirring motor and 1 set of 304 st*nless steel stirring paddles; (power 25W, speed 120rpm), (including 1 speed regulator)
4. 1 set of CASS reaction tank device, including 1 set of aeration tubes, 1 floating pen water device, 1 water inlet solenoid valve, 1 water outlet solenoid valve, made of transparent plexiglass, with a wall thickness of 10mm, 600×350×600mm,
5. 1 set of anti-corrosion lifting magnetic water pump, flow rate: 16~19 (L/min), head: 2.7~3.4 (m), power 20W;
6. 1 stirring motor, 1 set of 304 st*nless steel stirring paddle; (power 25W, speed 120rpm), (including 1 speed regulator)
7. 1 *r pump, power: 40 W, maximum gas volume: 16L/min, with 1 set of microporous aeration tubes,
8. Flow measurement and regulation: 1 water inlet liquid flowmeter: range 2-20L/H,
9. Flow measurement and regulation: 1 gas flowmeter: range 250~2500L/h;
10. 1 set of programmable automatic controller,
power control system: 1 double-sided matte dense pattern spray-coated electric control box, leakage protector (Delixi brand), voltmeter, lockable button switch, wire pipe, etc.
11. Matching UPVC connecting pipes and valves (Zhongc* brand).
12. St*nless steel frame test bench (30mm×30mm st*nless steel square tube, with casters for universal wheels with locking feet), etc.
13. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, weiya control cabinet, pressure regulating tank, flow switch, terminal water testing device, dr*nage facility, water pump coupler, hydraulic alarm, delay device, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle demonstration: Demonstrate the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with practice module (4 built-in multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score will be displayed after submission. B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system
2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, with prompts for correct and wrong choices), and schematics (you can enter the equipment from the schematics). The equipment includes: nozzles, HFC-227 storage bottles, bottle head valves, heptafluoropropane check valves, high-pressure hoses, gas check valves, safety valves, weighing alarms, electromagnetic starters, selector valves, smoke alarms, and fire alarm controllers.
3. Principle display: It shows the working principle of the gas fire extinguishing system, with a three-dimensional animation demonstration and a semi-transparent three-dimensional model, so that the internal gas can be seen. It is equipped with an exercise module (3 built-in multiple-choice questions, with prompts for correct and wrong choices)
4. Design layout: There are 6 multiple-choice questions, each of which is scored. After submission, the correct answer and score will be displayed.
C. Escape drill: Teaching is carried out in the form of fun games. Escape from the burning room within a limited time. If you make a wrong choice, you will directly enter the score interface.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap