DY-235 MBR process municipal sewage treatment training platform
Release time:2024-06-24 02:30viewed:times
1. Experimental purpose:
MBR process is a new sewage . It is m*nly composed of anaerobic and aerobic biological treatment devices, membrane separation components, sludge concentration and return systems, etc. Most of the organic matter in the sewage is decomposed by microorganisms, and the membrane separation components intercept the particles and microorganisms in the mixed liquid with a diameter larger than the membrane pore size, thereby obt*ning clear treated water.
2. M*n technical indicators and parameters:
1. Treated water volume: 10~15L/h;
2. BOD removal rate: 95%~99%,
3. COD removal rate: 90%~96%,
4. SS removal rate: >99%,
5. NH3-N removal rate: 75%~83%,
6. TP removal rate: 94%~98%,
7. MLSS: 3000~15000mg/L;
8. Overall dimensions of the device: 2800mm×450mm×1600mm.
9. Working power supply: AC220V±10%, 50Hz, single-phase three-wire system, power 1200W, safety protection: with grounding protection, leakage protection, overcurrent protection
Equipment configuration:
1. 1 set of grid tank (spacing 2mm), 1 set of aerated grit chamber (volume 15L), membrane bioreactor (volume 100L): transparent plexiglass material, thickness 10mm;
2. 1 set of vertical flow primary sedimentation tank: transparent plexiglass material, thickness 6mm, volume 20L;
3. 1 set of ultraviolet sterilization device: 1 set of ultraviolet lamp, 1 plexiglass column, 1 set of light-shielding aluminum platinum paper;
4. 1 each of raw water tank, intermediate water tank (30L) and clean water tank: white PP board, thickness 10mm, with a dr*n valve installed on the bottom plate to facilitate water dr*nage;
5. 1 stirring motor (power 15W, speed 90rpm), 1 set of 304 st*nless steel stirring paddle;
6. 2 anti-corrosion lifting magnetic water pumps, flow rate: 16-19 (L/min), head: 2.7-3.4 (m), power 20W;
7. 1 aeration pump (power supply 220V, power 40W, maximum gas volume: 8L/min), including 1 set of aeration pipelines;
8. 1 set of flat membrane assembly (PVDF flat membrane, area: 0.1m2/piece, 5 pieces in total);
9. 1 outlet diaphragm pump, 1 outlet flow meter, (range 3-30L/H)
10. Mixed liquid reflux device: 1 reflux pump, 1 set of reflux pipelines;
11. Flow measurement and regulation: rotor flowmeter, 3 liquid flow (range 3-30L/H), 1 gas flow (range 100~1000L/h);
12. Power supply control system: 1 double-sided matte dense pattern spray-coated electric control box, leakage protector (Delixi brand), voltmeter, lockable push button switch, wire pipe, etc.
13. Matching UPVC connecting pipes and valves (Zhongc* brand).
14. St*nless steel frame test bench (30mm×30mm st*nless steel square tube, with casters as universal wheels with locking feet), etc.
15. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). Equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selector valve, smoke alarm, fire alarm controller. 3. Principle display: Demonstrate the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with practice module (3 built-in multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are 6 multiple-choice questions, each with scores, and the correct answer and score will be displayed after submission. C. Escape drill: Teaching in the form of fun games, escape from the burning room within a limited time, and wrong choices will directly enter the score interface.