1. Experimental principle and purpose:
The m*n characteristics of high-concentration organic industrial wastewater are: high pollutant concentration, COD can reach tens of thousands or even hundreds of thousands of mg/L; complex composition, often cont*ning toxic and harmful organic substances and heavy metals; low B/C, not easy to biodegrade; high water temperature, etc.
This experiment uses the "*r flotation" + "micro-electrolysis" + "UASB" treatment process to treat high-concentration industrial wastewater to make it meet the discharge standards.
Micro-electrolysis:
Micro-electrolysis technology, also known as internal electrolysis, iron reduction, iron-carbon method, zero-valent iron method, iron filings filtration method, etc., is a wastewater treatment technology that has been widely studied and applied. It m*nly achieves the ch*n breaking of macromolecular organic matter, removes various particulate metal ions in wastewater, promotes the adsorption and condensation of pollutants, and improves the biodegradability of wastewater through (1) redox reaction (2) galvanic cell reaction (3) electrochemical enrichment (4) physical adsorption (5) coagulation and precipitation of iron ions.
UASB: Upflow anaerobic sludge blanket (UASB) reactor is the m*n anaerobic process for treating high-concentration refractory wastewater. The wastewater to be treated is introduced into the bottom of the UASB reactor and flows upward through the sludge bed composed of flocculent or granular sludge. As the sewage and sludge come into contact, anaerobic reactions occur, producing biogas (m*nly methane and carbon dioxide) and causing disturbances in the sludge bed. Among the gases produced by the sludge bed, a part is attached to the sludge particles, and the free bubbles and bubbles attached to the sludge particles rise to the top of the reactor and hit the bottom of the degassing baffle, which causes the attached bubbles to be released and the degassed sludge particles to settle back to the surface of the sludge layer. The free gas and the gas released from the sludge particles are collected in the gas collecting chamber at the top of the reactor. Some rem*ning solids and biological particles cont*ned in the liquid enter the sedimentation chamber, and the rem*ning solids and biological particles are separated from the liquid and fall back to the top of the sludge layer through the reflector.
Through this experiment, we hope to achieve the following goals:
1. Master the general process of high-concentration industrial wastewater treatment;
2. Deepen the understanding of the principles of this experiment;
3. Understand the process flow and technical parameters of this experiment, and improve students' theoretical and practical knowledge.
II. M*n technical indicators and parameters:
1. Ambient temperature: 5℃~40℃
2. Treated water volume: 5~12L/h
3. Equalization tank: HRT 3~5h
4. Coagulation tank: HRT 3~6h
5. Flotation tank: HRT 1~1.5h
6. Intermediate equalization tank: HRT 3~5h
7. Micro-electrolysis aeration tank: HRT 3~6h
8. Neutralization tank: HRT 1~3h
9. Vertical flow secondary sedimentation tank: HRT 2~4h
10. UASB: HRT 4~8h
11. Contact oxidation tank: HRT 6~14h
12. Inclined tube sedimentation tank: HRT 2~4h
13. Influent water quality: CODcr 4000~8000mg/L Outlet water quality: CODcr 80~160mg/L
14. Influent water quality: BOD5 1000~3000mg/L Outlet water quality: BOD5 10~30mg/L
15. Inlet suspended solids: SS 1000~2000mg/L Outlet suspended solids: SS 15~30mg/L
16. pH value: 5~8
17. Device dimensions: 11000mm×550mm,
18. Working power supply: AC220V±10%, 50Hz, single-phase three-wire, power 5000W, safety protection: with grounding protection, leakage protection, overcurrent protection,
three. M*n parameters and configuration:
pretreatment, primary treatment, secondary treatment, tertiary treatment, can be used in connection or alone.
1. One original regulating water tank: white polyethylene material, 100L, with a dr*n valve installed on the bottom plate to dr*n the water easily;
2. Three intermediate regulating water tanks: white polyethylene material, 60L, with a dr*n valve installed on the bottom plate to dr*n the water easily;
3. One clean water tank: white polyethylene material, 60L, with a dr*n valve installed on the bottom plate to dr*n the water easily;
4. One original water tank stirring motor and one set of 304 st*nless steel stirring paddles (power 25W, speed 120rpm), (including one speed regulator)
5. One dosing coagulation tank, made of transparent plexiglass, wall thickness 10mm, 300×300×400mm, one set of stirring device with motor,
6. One vertical flow flotation tank treatment, made of plexiglass, wall thickness 8mm, Ø350×600mm, one set of scraping device with motor,
7. 1 set of catalytic oxidation treatment, made of plexiglass, with a wall thickness of 6mm, Ø150×1000mm, cont*ning an ozone machine (producing 3 grams of gas);
8. 1 set of micro-electrolysis treatment, made of transparent plexiglass, with a wall thickness of 8mm, Ø350×500mm, cont*ning 1 batch of iron and carbon;
9. 1 set of neutralization tank, made of transparent plexiglass, with a wall thickness of 10mm, 350×300×400mm;
10. 1 set of vertical flow secondary sedimentation tank, made of transparent plexiglass, with a wall thickness of 8mm, Ø300×400mm;
11. 1 set of UASB anaerobic column, with jacket insulation, made of plexiglass, with a wall thickness of 8mm, Ø250×2000mm, with a three-phase separator on the upper part, on which there are 5 inlet valves, mud valves, outlet valves, *r valves, and UPVC sampling valves. Accessories include 1 set of 304 st*nless steel constant temperature water bath (generally m*nt*ned at 35-45 degrees), 1 circulating constant flow water pump (maximum head 10m, rated flow 12L/min, power 90W), 1 set of temperature control system (temperature control accuracy: ±1℃), and 1 PT100 temperature sensor ;
12. 1 set of contact oxidation tank, made of plexiglass, with a wall thickness of 10mm, 350×300×600mm, with aeration device, semi-soft filler
13. 1 set of radial flow sedimentation tank, made of transparent plexiglass, with a wall thickness of 8mm, Ø300×400mm, with a motor stirring device
14. 2 sets of activated carbon adsorption columns, made of transparent plexiglass, with a wall thickness of 6mm, Ø100×2000mm, cont*ning 1 batch of activated carbon filler
15. 2 sets of deep treatment filter columns, made of transparent plexiglass, with a wall thickness of 6mm, Ø100×2000mm, cont*ning 1 batch of quartz sand filler
16. 8 sets of anti-corrosion lifting magnetic water pumps, flow rate: 16~19 (L/min), head: 2.7~3.4 (m) power 20W;
17. 2 sets of dosing metering peristaltic pumps, flow range: 0.008-460mL/min, equipped with 2 plexiglass dosing boxes,
18. 1 *r compressor (power supply 220V, power 550W, maximum gas volume: 36L/min, gas volume 8L),
19. 2 *r pumps, power: 40W, maximum gas volume: 16L/min,
20. Flow measurement and regulation: 6 rotor flow meters (LZS-15, range 6~60L/h)
21. Flow measurement and regulation: 3 gas flow meters (LZB-10, range 250~2500L/h)
22. 1 automatic controller,
23. Power control system: 1 double-sided matte dense pattern spray-coated electric control box, leakage protector (Delixi brand), voltmeter, lockable button switch, wire pipe, etc.,
24. Matching UPVC connecting pipes and valves (Zhongc* brand).
25. St*nless steel frame laboratory table (30mm×30mm st*nless steel square tube, equipped with universal casters with locking feet), etc.
26. Virtual simulation software for electrical installation of building and intelligent building Designed based on unity3d, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Wia control cabinet, pressure regulating tank, flow switch, end water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water tank. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 multiple-choice questions are built-in, and there are prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment recognition: There are optimal viewing angles, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, and there are prompts for correct and wrong choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: nozzles, HFC-227 storage bottles, bottle head valves, heptafluoropropane check valves, high-pressure hoses, gas check valves, safety valves, weighing alarms, electromagnetic starters, selection valves, smoke alarms, and fire alarm controllers. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstrations, and 3D models are semi-transparent, and the internal gas can be seen. Equipped with practice module (built-in 3 multiple-choice questions, with prompts for correct and wrong choices) 4. Design and layout: There are 6 multiple-choice questions, each with a score, and the correct answer and score will be displayed after submission C. Escape drill: Teaching in the form of fun games, escaping from the burning room within a limited time, and wrong choices will directly enter the score interface. Similar products:

ZR-221B type
Industrial organic wastewater treatment complete set of experimental equipment (computer control)
M*n parameters and configuration:
pretreatment, primary treatment, secondary treatment, and tertiary treatment, which can be used in connection or separately.
Water treatment volume: 10L/h, device dimensions: 11000mm×550mm, power supply 220V, power 3000W, configuration: 1 set of dosing coagulation flotation treatment, 1 set of catalytic oxidation micro-electrolysis treatment, 1 set of anaerobic contact oxidation treatment, 1 set of activated carbon and quartz sand filtration depth treatment, 3 polyethylene dosing water tanks, 4 polyethylene regulating water tanks, 5 sets of stirring devices, 3 *r compressors, 12 flow meters, 3 dosing metering pumps, 11 anti-corrosion and anti-alkali water pumps, 1 batch of various fillers, 1 batch of PVC connecting pipes, 1 batch of PVC ball valves, 1 Lenovo computer, 1 19-inch LCD monitor, 1 computer control circuit board, 1 computer connection line, 1 computer communication interface, 1 set of software, electric control box, leakage protection switch, button switch, connecting pipes and ball valves, st*nless steel stand with moving wheels, etc.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap