Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYLY-BAS SAS and BAS integrated system application training platform

Release time:2024-06-21 05:30viewed:times
  • DYLY-BAS SAS and BAS integrated system application training platform

1. Overview The hardware of
the SAS and BAS integrated system application teaching platform and the building automation system tr*ning device consists of four parts: three-dimensional platform, system components, auxiliary materials and tools. The three-dimensional platform m*nly includes high-grade aluminum profile brackets, mesh panels, mesh electrical boxes, standard 19-inch racks and cable ducts; system components m*nly include various power supplies, networks, monitoring, display, input and output devices; auxiliary materials m*nly include various wires, connections and fasteners; tools m*nly include ladders, various common and special tools, etc. The software consists of various special system software and general monitoring software.
Using the SAS and BAS integrated system application teaching platform and the building automation system tr*ning device, students can design, install, wire, program, configure, integrate, debug, run, diagnose and m*nt*n "video surveillance and peripheral security system", "intelligent lighting system" and "SAS and BAS integrated system" in each custom area of ​​the three-dimensional platform, so as to understand the actual application of each system and master its basic technical points. It can tr*n and test students' teamwork, planning and organization, communication, engineering planning and implementation capabilities, enrich professional qualities, and improve comprehensive professional skills. It is a building electrical and intelligent system application teaching platform suitable for project assessment, teacher teaching and student experimental tr*ning and other requirements.
(1) SAS and BAS integrated system application teaching platform, building automation system tr*ning device The three-dimensional platform structure design is adopted, and the different areas represented by each mesh panel can be defined according to the design and the system can be built, such as the distribution room, management room, equipment room, corridor area on a cert*n floor and office area;
(2) The position matching design of the mesh panel and the cable trough is adopted to ensure the shortest distance connection between any two mesh panels;
(3) The mesh specifications and arrangement of the optimization algorithm are adopted, which can increase the number of effective fixing points while improving the strength of the mesh panel;
(4) The patented "expansion fixing for mesh panel" is adopted, and the self-tapping screws are used to quickly fix the device, which is more convenient and faster, and closer to the actual application of the project;
(5) The open-box device, open mesh panel and rack are adopted to improve the transparency of system installation and wiring, which is conducive to enhancing the understanding of the system.
(6) Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interface according to the computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, the contents are as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: sprinklers, water flow indicators, signal butterfly valves, exhaust valves, fire alarm controls, high-pressure gauges, high-level water tanks, Wia control cabinets, pressure-stabilizing tanks, flow switches, terminal water testing devices, dr*nage facilities, water pump connectors, hydraulic alarms, time delays, wet alarms, butterfly valves, check valves, fire pumps, safety pressure-stabilizing valves, and fire water tanks. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, and semi-transparent 3D models , so that the internal water flow can be seen. Equipped with practice module (built-in 4 multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), practice (built-in 8 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane check valve, high-pressure hose, gas check valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with a practice module (3 multiple-choice questions built in, with prompts for correct and incorrect choices) 4. Design layout: There are 6 multiple-choice questions, each with a score. The correct answer and score will be displayed after submission. C. Escape drill: Teaching is carried out in the form of fun games. Escape from the burning room within a limited time. Wrong choices will directly enter the score interface. II. Equipment composition (1) Video surveillance and peripheral security system; (2) Intelligent lighting system; (3) SAS and BAS integrated system. III. Technical parameters (1) Power input: single-phase three-wire/AC220V/50Hz; (2) Safety protection: grounding/leakage (action current ≤30mA)/overvoltage/overload/short circuit; (3) Whole machine power consumption: ≤0.5KW; (4) Whole machine weight: 250KG; (5) Overall dimensions: 1940mm×1070mm×2250mm (length×width×height). IV. Configuration table

category Serial number name quantity unit Remark
SAS and BAS integrated system application teaching platform, building automation system tr*ning device platform 1.1  High-grade aluminum bracket 1 tower  
1.2  Stencil 1 Batch  
1.3  Wire duct 1 Batch Specific layout
1.4  Mesh electric box 1 indivual Leakage switch, switching power supply and wiring terminals, etc.
1.5  Standard 19-inch rack 1 tower Power strips, brackets and keyboard activity panels, etc.
1.6  Computer Mobile Cart 1 tower  
1.7  Round steel stool 1 Bundle  
Video surveillance and perimeter security system components 2.1  DVR 1 tower  
2.2  harddisk 1 indivual  
2.3  Monitor 1 indivual  
2.4  Variable speed ball head 1 tower  
2.5  Integrated camera core 1 indivual  
2.6  Infrared camera 1 tower  
2.7  Active infrared detector 1 indivual  
2.8  Passive infrared curt*n detector 1 indivual  
2.9  Sound and light alarm 1 indivual  
2.10  Network Video Surveillance Management Software 1 set EPSS
Intelligent lighting system components 3.1  DC24V relay 4 indivual  
3.2  Light level switch 1 indivual  
3.3  Halogen lamp 1 indivual  
3.4  Light sensor 1 indivual  
3.5  LED Dimming Driver 1 indivual  
3.6  LED Light 1 indivual  
3.7  LED Flashlight 1 indivual  
3.8  Passive infrared detector 1 indivual  
3.9  fluorescent lamp 1 indivual  
3.10  Triple scene button 1 indivual  
3.11  Fluorescent Tubes 2 indivual  
3.12  emergency switch 1 indivual  
3.13  DDC Control Module 1 tower  
3.14  LON Network Interface 1 indivual  
3.15  DDC programming software and related plug-in programs 1 set LonMaker3.12
SAS and BAS integrated system components 4.1  Network jumper 1 root  
4.2  Video Interface Server Software 1 set VNS Server
4.3  DDE interface server software 1 set LNS DDE Server 2.1
4.4  Configuration Software 1 set KingView 6.52
Supplementary materials 5.1  Expansion fixings for mesh panels 500 indivual  
5.2  Self-tapping screws 1 Batch  
5.3  Soft wire 0.22mm2 1 Batch Yellow, green, red, blue, black
5.4  Soft wire 1.5mm2 1 Batch Red, black, yellow and green
5.5  Twisted p*r 2×0.2mm2 1 Batch  
5.6  Video cable SYV75-2 1 Batch  
5.7  Video Head JS-2 1 Batch  
5.8  Heat shrink tubing 1 roll  
tool 6.1  Ladders 1 Bundle  
6.2  Transparent component box 1 indivual  
6.3  Toolbox 1 indivual  
6.4  multimeter 1 indivual  
6.5  Hand drill handle 2 Bundle  
6.6  Drill bits 2 branch  
6.7  Scissors 1 Bundle  
6.8  Wire strippers 1 Bundle  
6.9  Diagonal pliers 1 Bundle  
6.10  Small flathead screwdriver 1 Bundle  
6.11  Small Phillips screwdriver 1 Bundle  
6.12  Large Phillips screwdriver 1 Bundle  
V. Tr*ning content
(1) Completable tr*ning projects
1) Tr*ning on the connection and monitoring of variable speed ball camera, infrared camera and monitor with hard disk recorder;
2) Tr*ning on controlling the movement of variable speed ball head and the movement of integrated camera core lens through hard disk recorder;
3) Tr*ning on setting and calling the preset position of variable speed ball head through hard disk recorder;
4) Tr*ning on automatic recording of dynamic changes of monitoring screen;
5) Tr*ning on the connection and setting of passive infrared curt*n detector, active infrared beam detector and sound and light alarm with hard disk recorder;
6) Tr*ning on the linkage between video monitoring system and peripheral security system;
7) Tr*ning on LAN monitoring of network video monitoring management software;
8) Tr*ning on LonMaker software installation and plug-in registration;
9) Tr*ning on the connection of light intensity switch and halogen tungsten lamp with DDC control module and schedule time programming of Event_Scheduler function module;
10) 1) Tr*ning on the connection between light intensity sensor, LED dimming driver and LED lamp and DDC control module, and the analog input and output programming of Universal_Input function module;
11) Tr*ning on the connection between passive infrared detector and fluorescent lamp and DDC control module, and the delay programming of Universal_Input function module;
12) Tr*ning on the connection between triple scene button and fluorescent tube and DDC control module, and the digital logic programming of State_Machine function module;
13) Tr*ning on the connection between emergency switch and DDC control module, and the analog logic programming of Analog_Function function module;
14) Tr*ning on the connection between configuration software and hard disk recorder through video interface server and monitoring real-time images;
15) Tr*ning on the connection between configuration software and DDC host module through DDE interface server and monitoring real-time data;
16) Tr*ning on the integration of video surveillance and peripheral security system and intelligent lighting system based on configuration software.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap