Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYLY-JKX Building Engineering Intelligent Equipment Monitoring System Training Platform

Release time:2024-06-20 16:00viewed:times
  • DYLY-JKX Building Engineering Intelligent Equipment Monitoring System Training Platform
1. Equipment Overview The tr*ning device for
building engineering intelligent equipment monitoring system is based on the development trend and characteristics of the intelligent building industry, combined with the functions and applications of building intelligent technology, and guided by the work tasks of the building 5A subsystem. It is based on the comprehensive application and expansion of various technologies such as building intelligence, industrial automation, computer network communication, integrated wiring and system integration. It meets the system and principle demonstration, skill display, work task design and planning, tr*ning, process and result evaluation, assessment, appr*sal, competition, engineering project design and graduation design of technicians and vocational colleges in building intelligent equipment installation and operation, building equipment installation, automation control, computer network and communication system engineering and other related majors; it systematically tr*ns students' professional skills, practical hands-on skills (installation, wiring, wiring, programming, debugging, operation, m*ntenance and rep*r, etc.), design planning, communication, teamwork, efficiency awareness and innovative thinking, and at the same time cultivates their rigorous work style and good professionalism.
2. Technical indicators
(1) Power input: single-phase three-wire (third-party grounding), AC220V±10%, 50/60Hz;
(2) Safety protection: grounding, leakage (operating current ≤30mA), overvoltage, overload, short circuit;
(3) Power consumption: ≤300W;
(4) Dimensions (width×height×depth): 1060mm×1900mm×800mm (industrial aluminum profile bracket);
3. Tr*ning projects
a) Basic practical part
System installation, wiring, wiring, programming, debugging, operation, m*ntenance and rep*r;
setting, detection and troubleshooting of line faults;
installation and wiring of bridges and their brackets;
installation of information sockets and rack equipment;
production and testing of crystal heads and jumpers;
crimping and testing of RJ45 modules and patch panels;
connection of RJ45 jumpers and link testing.
b) Analog I/O module
Recognition, measurement and connection of four standard signals (DI/DO/AI/AO);
program design, writing, debugging and monitoring;
configuration monitoring interface design.
c) Fresh *r unit simulation model system module
Fresh *r temperature monitoring;
Fresh *r humidity monitoring;
Supply *r temperature monitoring;
Supply *r humidity monitoring;
Filter pressure difference switch monitoring;
Heat exchanger antifreeze switch monitoring;
Supply fan pressure difference switch monitoring;
Supply fan start and stop status monitoring;
Supply fan manual/automatic status monitoring;
Supply fan fault monitoring;
Heater electric valve control;
Refrigeration plate electric valve control;
Humidifier electric valve control;
Fresh *r valve switch control;
Supply fan start and stop control;
System integration monitoring.
d) Air conditioning unit simulation model system module
Indoor carbon dioxide concentration monitoring;
Return *r temperature monitoring;
Filter pressure difference switch monitoring;
Heat exchanger antifreeze switch monitoring;
Supply fan fault status monitoring;
Supply fan pressure difference switch monitoring;
Return fan fault status monitoring; Return fan
pressure difference switch monitoring ;
Fresh *r valve adjustment control;
Heat exchanger electric valve adjustment control;
Return *r valve adjustment control;
Exhaust valve adjustment control ;
Supply *r valve switch control;
Return fan start and stop control;
System integration monitoring.
e) Power supply and distribution simulation model system module
1# incoming line voltage monitoring;
# incoming line current monitoring;
1# incoming line power factor monitoring;
2# incoming line voltage monitoring;
2# incoming line current monitoring;
2# incoming line power factor monitoring;
1# power supply circuit switch monitoring;
2# power supply circuit switch monitoring;
dual power supply switch monitoring;
1# circuit switch control;
2# circuit switch control;
system integration monitoring.
f) Lighting simulation model system module
Light intensity sensor monitoring;
Light intensity switch monitoring;
Landscape area lighting switch monitoring;
work scene switch monitoring;
lunch break scene switch monitoring;
off-work scene switch monitoring;
emergency switch monitoring;
lobby area lighting dimming control;
landscape area lighting switch control;
office area 1# lighting switch control;
office area 2# lighting switch control;
system integration monitoring.
g) Water supply and dr*nage simulation model system module
M*n water supply pump fault status monitoring;
standby water supply pump fault status monitoring;
low limit alarm water level switch monitoring;
pump start water level switch monitoring; pump
stop water level switch monitoring;
dr*nage pump manual/automatic status monitoring;
dr*nage pump fault status monitoring;
pump stop water level switch monitoring; pump start water level switch monitoring
;
overflow alarm water level switch monitoring;
m*n water supply pump start and stop control;
standby water supply pump start and stop control;
dr*nage pump start and stop control;
system integration monitoring.
h) Heat exchange simulation model system module
Heating network steam temperature monitoring;
1# heat exchanger outlet water temperature monitoring;
2# heat exchanger outlet water temperature monitoring;
water return temperature monitoring;
1# pump start and stop status monitoring;
1# pump manual/automatic status monitoring;
1# pump fault status monitoring;
2# pump start and stop status monitoring
; 2# pump manual/automatic status monitoring;
2# pump fault status monitoring;
1# electric valve adjustment control;
2# electric valve adjustment control;
1# pump start and stop control;
2# pump start and stop control;
system integration monitoring.
i) Elevator simulation model system module
Start and stop status monitoring;
Up state monitoring;
Down state monitoring;
First
floor status monitoring; 2nd floor status monitoring;
Nth floor status monitoring;
Fault status monitoring;
Emergency status monitoring;
Normal start control;
Fire stop control;
System integration monitoring.
j) Smart home simulation model system module
Out-of-home deployment scene switch monitoring;
home deployment scene switch monitoring;
disarming scene switch monitoring;
dining scene switch monitoring;
meeting scene switch monitoring;
theater scene switch monitoring;
door magnetic switch monitoring
; passive infrared detector detection;
gas detector switch monitoring;
water/electricity/gas meter pulse monitoring;
living room LED light dimming control;
electric curt*n switch control;
dining room fluorescent light switch control;
sound and light alarm switch monitoring;
system integration monitoring.
4. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system
2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and incorrect choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: sprinklers, water flow indicators, signal butterfly valves, exhaust valves, fire alarm controls, high-pressure gauges, high-level water tanks, Wia control cabinets, pressure-stabilizing tanks, flow switches, terminal water testing devices, dr*nage facilities, water pump connectors, hydraulic alarms, time delays, wet alarms, butterfly valves, check valves, fire pumps, safety pressure-stabilizing valves, and fire water tanks.
3. Principle display: Displays the working principle of the wet alarm system, 3D animation demonstrations, and semi-transparent 3D models, so you can see the internal water flow. Equipped with practice module (built-in 4 multiple-choice questions, with prompts for correct and wrong choices)
4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score will be displayed after submission
B. Gas fire extinguishing system
1. System overview: Overview of gas fire extinguishing system
2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), practice (built-in 8 multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane check valve, high-pressure hose, gas check valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller.
3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with a practice module (built-in 3 multiple-choice questions, with prompts for correct and incorrect choices)
4. Design layout: There are 6 multiple-choice questions, each with a score, and the correct answer and score will be displayed after submission
C. Escape drill: Teaching in the form of fun games, escaping from the burning room within a limited time, and wrong choices will directly enter the score interface.
5. Building Engineering Intelligent Equipment Monitoring System Tr*ning Platform

Serial number Equipment Name quantity unit Remark
1 Vertical tr*ning platform 1 tower  
2 Mesh plate installation module 8 piece  
3 Expansion fixings for mesh panels 100 indivual  
4 Cable Management 12 indivual  
5 Power Management Module 1 tower  
6 Embedded programming host and display module 1 set  
7 Host monitoring module 1 tower LonWorks Bus DDC
8 LON network communication adapter 1 indivual  
9 LonMaker Programming Software 1 set  
10 Analog I/O Modules 1 piece  
11 Fresh *r unit simulation model system module 1 piece  
12 Air conditioning unit simulation model system module 1 piece  
13 Power supply and distribution simulation model system module 1 piece  
14 Lighting simulation model system module 1 piece  
15 Water supply and dr*nage simulation model system module 1 piece  
16 Heat exchange simulation model system module 1 piece  
17 Elevator simulation model system module 1 piece  
18 Smart home simulation model system module 1 piece  
19 6-bit PD power supply 1 indivual  
20 24-position Category 5e non-shielded socket patch panel 1 indivual  
twenty one 8P8C Category 5e non-shielded crystal head 20 indivual  
twenty two Category 5e non-shielded information socket module 4 indivual  
twenty three Single port 86 type information panel 4 indivual  
twenty four 86 type bottom box 4 indivual  
25 TP Category 5e 4 p*rs of unshielded patch cord 4 strip  
26 TP Category 5e 4-p*r unshielded cable 100 rice  
27 Special bridge 1 set  
28 Consumables and tools 1 set Wires of various specifications, common electrical tools and cable testers, etc.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap