Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYGLCZ-SX pipeline disassembly and assembly training platform

Release time:2024-06-16 11:30viewed:times
  • DYGLCZ-SX pipeline disassembly and assembly training platform
The system organically combines the fluid transportation and pipeline disassembly and assembly systems, and cooperates with pumps and valves, disassembly and assembly to tr*n the basic hands-on m*ntenance and operation capabilities of chemical master control and chemical equipment m*ntenance workers.

The pipeline disassembly and assembly equipment system is m*nly composed of cont*ners, pumps, pipelines, valves, instruments, disassembly and assembly tools, pressure testing equipment, tool and material shelves, etc. The system not only exercises the pipeline disassembly and assembly capabilities of chemical equipment, but also tr*ns the installation of chemical automation instruments and pump bodies.

1. System features

(1) Used to tr*n students to disassemble and assemble common pipelines and fittings in chemical production.

(2) The system facilitates the assessment of students’ ability to select accessories, disassemble and assemble, operate the device, complete tasks, etc., and has corresponding judgment criteria and methods.

(3) The system provides sufficient optional accessories, disassembly and assembly tools, equipment for inspecting operation, etc.

(4) Parts that are frequently disassembled and assembled must be solid and durable, convenient for students to use for a long time, and able to provide updated equipment.

2. Functions of the system

(1) Reading of flow charts.

(2) Be able to accurately fill in the material list of specifications, models and quantities of pipes, fittings, valves and instruments required for pipeline installation based on the provided fluid transportation flow chart.

(3) Be able to correctly collect the required materials according to the materials list.

(4) Be able to accurately list the tools and consumables required for assembling pipelines and collect the tools and consumables correctly.

(5) Capable of assembling pipelines.

(6) Capable of conducting pipeline pressure testing.

(7) Capable of dismantling pipelines.

(8) Ability to comply with safety regulations during pipeline disassembly and assembly.

3. Pipeline disassembly and assembly tr*ning content

(1) Pipeline assembly

(a) Processing of pipe threads and use of dies.

(b) Install the pipeline according to the pipeline schematic diagram. During installation, ensure that it is horizontal and vertical, with a horizontal deviation of no more than 15 mm and a vertical deviation of no more than 10 mm.

(c) When flanges and threads are connected, the parallelism and concentricity of each p*r of flanges must meet the requirements. When threads are connected, the direction of the raw tape winding must be correct and the thickness must be appropriate. When the threads and pipe fittings are engaged, they must be aligned and aligned, and the tightening force must be moderate.

(d) Valve installation: Before installing the valve, clean the inside of the valve and close it before installation. Directional valves must match the flow direction of the medium. The handwheel position of the installed valve must be convenient for operation.

(e) Installation of flow meter, pressure gauge and filter should be carried out according to specific installation requirements. Pay attention to the flow direction and make sure the position of the scale is easy to read.

(2) Water pressure test

Be able to use a hand-operated pressure test pump and complete the pressure test operation according to the required pressure test procedure. There is no leakage at all interfaces of the pipeline under the specified pressure and within the specified time.

(3) Pipeline disassembly

The process can be carried out in order, generally from top to bottom, first the instrument and then the valve. The pipe fittings and instruments must not be damaged during the disassembly process. The disassembled pipes, pipe fittings, valves and instruments should be classified and put away.

4. System configuration list

The system consists of the following five parts: 1. Pipeline disassembly and assembly object system; 2. Pipeline disassembly and assembly tools (including pressure test and leak detection equipment); 3. Pipeline disassembly and assembly shelves; 4. Pipeline disassembly and assembly spare parts.

(1) List of target systems

category

Serial number

name

Technical indicators (model)

quantity

Remark

1. Equipment body: Object part: length × width × height (4000 × 800 × 2000mm); p*nted channel steel base

 

2. Disassembly and assembly of pipelines and accessories

 

Tube

material

1

Imported st*nless steel pipe

DN50, Material: 304

1 set

 

2

Imported pipeline st*nless steel hose

DN50, pitch 11mm

1

 

3

Export pipeline st*nless steel pipe

DN32, Material: 304

1 set

 

4

Export pipeline st*nless steel pipe

DN25, Material: 304

1 set

 

Moving equipment

5

Centrifugal Pumps

IS50-32-125, mechanical seal horizontal coupling chemical pump, power supply: three-phase 380VAC, power: 2.2kW

1 set

 

Static Equipment

6

St*nless steel water tank

φ450X600mm X2mm

1

 

Valve body and accessories

7

Copper ball valve

DN15(national standard)

6

 

8

St*nless steel safety valve

DN25 (national standard)

1

 

9

Copper gate valve

DN25 (national standard)

2

 

10

St*nless steel flange stop valve

DN50 (national standard)

2

 

11

St*nless steel stop valve

DN32 (national standard)

4

 

12

Y-type st*nless steel filter

DN50 (national standard)

1

 

13

St*nless steel check valve

DN32 (national standard)

1

 

14

St*nless steel flange

DN50, 10KG

Several

 

15

St*nless steel flange

DN40, 10KG

 

16

St*nless steel flange

DN32, 10KG

 

17

St*nless steel flange

DN20, 10KG

 

18

90° welding elbow

DN50

 

19

90° welding elbow

DN32

 

20

Threaded Tee

1/2″

 

twenty one

Female short circuit

DN15

 

twenty two

8-shaped blind plate

Outer diameter 80 (st*nless steel 304 material)

2 tablets

 

twenty three

8-shaped blind plate

Outer diameter 60 (st*nless steel 304 material)

2 tablets

 

twenty four

Snake pressure gauge pipe

DN10

2

 

frame

25

Channel Steel

5#, Material: Q235.

1 set

 

26

Checkered Plate

Thickness 3.0mm, Material: Q235

1 set

 

Electronic control testing equipment

27

Air switch box

4P

1

 

28

4P *r switch

Rated current: 32A; Working voltage: 380V; Function: short circuit protection, overload protection

1

 

Flow detection equipment

29

Glass rotor flowmeter

Glass rotor flowmeter (LZB-40), accuracy: 2.5% FS

1

 

Pressure testing equipment

30

Outlet pressure gauge

Pointer pressure gauge (0-0.25MPa),

Accuracy: 1.6%FS

1

 

31

Import pressure gauge

Pointer pressure gauge (-0.1-0Pa),

Accuracy: 1.6%FS

1

 

Temperature detection equipment

32

Bimetallic thermometer

Bimetallic thermometer (0-100),

Accuracy: 1.6%FS

1

 

(2) Pipeline disassembly and assembly rack

Serial number

name

Specifications

quantity

Remark

1

Pipeline disassembly and assembly rack

1800*500*1200 (length*width*height)

1

 

(3) Pipeline disassembly and assembly tools (including pressure test and leak detection equipment)

 (a) Commonly used metalworking and measuring tools:

Serial number

name

Specification

unit

quantity

1

Pipe Wrenches

450mm

Bundle

1

2

Pipe Wrenches

300mm

Bundle

1

3

adjustable wrench

12 inches

Bundle

1

4

adjustable wrench

10 inches

Bundle

1

5

Solid wrench

17~19

Bundle

2

6

Solid wrench

22~24

Bundle

2

7

Combination wrench

17mm

Bundle

1

8

Combination wrench

19mm

Bundle

1

9

Combination wrench

22mm

Bundle

1

10

Combination wrench

24mm

Bundle

1

11

Heart-piercing one-word batch

12 inches

Bundle

1

12

Screwdriver

large

Bundle

1

13

Screwdriver

Medium

Bundle

1

14

Cross screwdriver

Medium

Bundle

1

15

Level

300mm

Bundle

1

16

Square

L-type, 150×300mm

Bundle

1

17

tape measure

3m

Bundle

1

18

Vernier caliper

0~150mm

Bundle

1

19

helmet

Orange

top

3

(b) General spare parts:

Serial number

name

Specification

unit

quantity

1

Flatbed trolley

710×430mm, load-bearing capacity 200 catties

Vehicle

1

2

Pressure test pump

SB-2.5 manual, steel

tower

1

3

Threading Machine

Manual threading machine

tower

1

 (4) Pipeline disassembly and replacement parts:

Serial number

name

Specification

unit

quantity

1

Bolts and nuts

M12×45

set

10

2

Bolts and nuts

M16×50

set

20

3

Bolts and nuts

M16×55

set

10

4

Raw tape

Polytetrafluoroethylene

roll

10

5

Asbestos gasket

DN25

piece

10

6

Asbestos gasket

DN32

piece

10

7

Asbestos gasket

DN40

piece

10

8

Asbestos gasket

DN50

piece

10


DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap