Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYHGYL-18 Single Tube Raidelin Evaporation Training Platform

Release time:2024-06-07 07:00viewed:times
  • DYHGYL-18 Single Tube Raidelin Evaporation Training Platform
Device function:
Observe the flow state of fluid water in the rising film evaporator (bubble flow, bullet flow, stirring flow and annular flow).
Measure the convective heat transfer coefficient and steam dryness under different flow patterns.
Design parameters:
Heat transfer coefficient: 1000-5000 (w/m.2.oC). Liquid flow: 4~40L/h, normal pressure operation.
Utilities:
Water: The unit comes with a st*nless steel water tank and is connected to tap water. During the experiment, it enters the test pipeline through the centrifugal pump and is recycled.
Electricity: voltage AC220V, power 2.5KW, standard single-phase three-wire system. Each laboratory needs to be equipped with 1~2 grounding points (safety ground and signal ground).
Experimental materials: clean tap water, external equipment: none.
M*n equipment:
1. 304 st*nless steel steam generator: power 2.0KW, adjustable, with insulation layer. The steam generator is designed with a safety water seal to eliminate safety hazards caused by safety valve f*lure. The steam generator is equipped with a pressure protection device with adjustable pressure settings and high and low pressure alarms.
2. 304 st*nless steel heating section: φ22*750mm, power 0.2KW adjustable, with insulation layer.
3. The length of the glass observation section is 200mm. The quartz glass window has a double-layer glass structure, which can protect the safety of observation and is protected by a plexiglass tube.
4. 304 st*nless steel measuring section: φ18*500mm, power 0.2KW adjustable, with insulation layer.
5. 304 st*nless steel liquid cooler: tube condenser, heat exchange area 0.1m2.
6. 304 st*nless steel steam condenser: tube condenser, heat exchange area 0.1m2.
7. Dimensions of single-tube rising film evaporator, tube inner diameter 14mm, tube length 1400mm. The outer diameter of the casing is 57mm and the tube length is 1400mm.
8. LZB-10 rotor flowmeter: flow range 6~60L/h.
9. One st*nless steel centrifugal pump. Water circulation vacuum pump, absolute pressure ≤3.3kpa.
10. Raw material box, volume 80L, made of 304 st*nless steel.
11. 6 thermocouples for body temperature, wall temperature and steam temperature.
12. Yudian AI702M multi-channel digital temperature display instrument. Yudian AI518 temperature controller (with manual function).
13. Chint Electric: contactors, switches, leakage protection *r switches.
14. Instrument cabinet: Measurement and control and electrical equipment are on the experimental rack.
15. Overall dimensions: 1500×550×1800mm (length×width×height), movable design, with brake wheels, high-quality aluminum alloy profile frame, no welding points, easy installation and disassembly, horizontally adjustable support casters.
16. Engineering signs: including equipment tags, pipeline flow direction arrows and logos, valve tags and other engineering equipment concepts, including safety warning signs, so that students can be in a safe experimental operating environment and learn to recognize engineering pipeline signs. knowledge and cultivate students’ engineering concepts.
17. Virtual simulation software for electrical installation of building buildings and smart buildings. Based on unity3d design, users can choose different interactive interface sizes according to computer configuration, and can choose from six image quality levels. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, and the content is as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment awareness: equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), and exercises (Built-in 6 multiple-choice questions, prompts for correct and incorrect choices), schematic diagram (can be entered into the device from the schematic diagram). Equipment includes: nozzle, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pipe pressure gauge, high water tank, Wia control cabinet, pressure stabilizing tank, flow switch, terminal water testing device, dr*nage facilities, water pump connection alarms, hydraulic alarms, delayers, wet alarms, butterfly valves, check valves, fire pumps, safety pressure regulators, and fire pools. 3. Principle display: Show the working principle of the wet alarm system, three-dimensional animation demonstration, the three-dimensional model is translucent, and the internal water flow can be seen. Equipped with a practice module (built-in 4 multiple-choice questions, with prompts for correct and incorrect choices) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment awareness: equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 8 multiple-choice questions, with prompts for correct and incorrect choices), Schematic diagram (access to the device from the schematic diagram). Equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire Alarm controller. 3. Principle display: Demonstrate the working principle of the gas fire extinguishing system, three-dimensional animation demonstration, the three-dimensional model is translucent, and the internal gas can be seen. Equipped with a practice module (built-in 3 multiple-choice questions, with prompts for both correct and incorrect choices) 4. Design layout: There are 6 multiple-choice questions, each question is scored, and the correct answer and score will be displayed after submission. C. Escape drill: adopted Teaching is conducted in the form of fun games. Escape from the burning room within a limited time. If you make a wrong choice, you will directly enter the score interface.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap