project | Basic theory and practical tr*ning teaching of professional courses |
Function |
1. Completely embodies the typical evaporation separation process, and the device meets the understanding, internship and practical tr*ning operation requirements for students majoring in chemical technology, chemical machinery and process control . 2. Examine the effects of heating temperature, feed concentration, feed amount, etc. on the evaporation separation process. 3. Be able to carry out practical tr*ning on the installation, m*ntenance and structural design of typical chemical equipment, and be able to carry out practical tr*ning on the plane and elevation layout and related drawings of typical chemical equipment. 4. Using intelligent instruments, control configuration and control experiments can be carried out, and it has system signal interlock protection function. When abnormal conditions such as overpressure and overtemperature of process equipment occur, the system can alarm in time and automatically stop safely, and control temperature and pressure. , flow and other parameters are monitored. DCS control system can also be used. 5. Master the control principles and schemes of typical equipment such as evaporators, condensers, separators, and pumps. In addition to on-site control of the start and stop of m*n motorized equipment, DCS can also operate, control and display operating status. The m*n process parameters have ground indication function. 6. Examine the operation of typical evaporation separation processes, examine the balance of materials and energy in the system; examine the impact of changes in major factors on the production system, and ensure that it can operate safely and for a long period to meet continuous operation requirements. 7. Film evaporation job skills Tr*ning: heating temperature measurement and control operations; feed concentration and feed amount measurement and control operations; 8. Quality control job skills tr*ning: evaporation concentrate sampling and component analysis operations; concentrate concentration control; 9. Chemical instrument job skills tr*ning: metering pumps, Use of rotameter, frequency converter, differential pressure transmitter, thermal resistor, paperless recorder, audible and visual alarm, voltage regulating module and various types of local spring pointer meters; single loop, cascade control and ratio control Implementation of control plans; 10. Skills tr*ning for local and remote control positions: communication between on-site console instruments and microcomputer, real-time data collection and process monitoring; communication between DCS console in the m*n control room and on-site console, switching of each operating section, and remote monitoring , upload and download of process configuration, etc. |
project | Skills tr*ning content |
Driving preparation |
1. Reading of flow charts; 2. Familiar with the site numbers, functions, working principles and usage of on-site devices and m*n equipment, instruments and valves; 3. Formulate operation plans as required; 4. Introduction of public works (water, electricity ) and ensure it is normal; 5. Preparation of evaporation raw materials (preparation of raw materials and determination of concentration); 6. Check whether all pipelines and valves in the process are in normal operating condition; 7. Power on the equipment and check whether the status of each instrument is normal; Equipment test run. |
drive |
1. Follow the correct driving steps; 2. Adjust the feed flow rate according to the instructions; w*t until the heating steam pressure reaches the specified value. |
normal operation |
1. Able to change feed flow, heating steam pressure and other parameters to specified values; 2. Observe the operating conditions of the rising film evaporator during normal operation, and point out factors that may affect its normal operation; 3. Able to adjust the evaporation process according to normal operation 4. Inspect the temperature, pressure, flow, and liquid level values as required and keep records; be able to judge whether each indicator is normal in a timely manner; 5. Inspect the operating conditions of moving equipment as required, confirm and keep records; 6 .Can measure heat transfer coefficient and apparent gas velocity. |
parking |
1. Stop the vehicle according to normal parking procedures; 2. Check the status of each equipment, valves, and tank liquid level after parking, and make records after confirmation. |
Equipment m*ntenance |
1. The starting, stopping, normal operation and d*ly m*ntenance of the pump; 2. The structure, working principle, normal operation and m*ntenance of the rising film evaporator; 3. The structure, working principle, normal operation and m*ntenance of the separator; 4. M*n valves The location, type, structure, working principle, normal operation and m*ntenance; 5. The measurement principle of temperature, flow, liquid level, conductivity and pressure sensors ; the normal operation of temperature, pressure, liquid level and conductivity display instruments and temperature control instruments use. |
control instrument |
1. Measurement principles of temperature, flow and pressure sensors; normal use of temperature and pressure display instruments and flow control instruments. 2. Control the normal use of the inverter and voltage regulator of the execution device. 3. Understand the parameters, detection locations, detection sensors and control methods that need to be detected and controlled when controlling the evaporator. |
Monitoring software |
Familiar with, understand and use the host configuration monitoring platform software, provide software installation and debugging and bring installation media. Mechanical tr*ning safety education virtual simulation software: This software is developed based on unity3d. The software adopts the form of three-dimensional roaming. Movement can be controlled by the keyboard and the lens direction can be controlled by the mouse. It is equipped with mechanical safety distance experiments, mechanical safety protection device experiments, and mechanical safety protection design. For the basic assessment, when the experiment is in progress, the three-dimensional roaming screen uses arrows and footprints to prompt the user to move to the experimental location. The circle around the mechanical object shows the working radius. The experimental process is accompanied by a dialog box reminder of the three-dimensional robot. A. The content of the mechanical safety distance experiment includes the safety distance experiment to prevent upper and lower limbs from touching the danger zone (divided into two fence heights and opening sizes). After selecting to enter, GB23821-2009 "Mechanical Safety to Prevent Upper and Lower Limbs from Touching the Danger Zone" pops up in front of the camera. "Safe Distance" requirements, error demonstration: The experimental process is that after the human body enters the working radius of the mechanical object and is injured, the red screen and voice prompts that the human body has received mechanical damage, and returns to the original position and conducts the next experiment. The last step is the correct approach. B. Mechanical safety protection device experiments are divided into safety interlock switches, safety light curt*ns, safety mats, safety laser scanners and other protection device experiments. Optional categories (safety input, safety control, safety output, others), manufacturers, products List (safety interlock switch, safety light curt*n, safety mat, safety laser scanner, safety controller, safety relay, safety guardr*l). There is a blue flashing frame reminder at the installation location. Experimental process: select the safety guardr*l and install it, select the safety interlock switch (or select the safety light curt*n, safety mat, safety laser scanner) and install it, select the safety controller and install it in the electrical control box , select the safety relay and install it in the electrical control box, click the start button on the electrical control box. If you enter a dangerous area, the system will sound an alarm and the mechanical object will stop working. Select the reset button on the electrical control box to stop. C. The basic assessment of mechanical safety protection design requires the completion of the installation of the mechanical safety system, and the correct installation of safety guardr*ls, safety interlock switches, safety light curt*ns, safety mats, safety laser scanners, safety controllers, safety relays, 24V power supplies, signal lights and Emergency stop button. The assessment is divided into ten assessment points. Some assessment points have 3 options, which are freely chosen by the students. After selecting the final 10 assessment points, submit for confirmation, and the system will automatically obt*n the total score and the score of each assessment point. . D. The software must be on the same platform as a whole and must not be displayed as separate resources. At the same time, the VR installation package of this software is provided to customers to facilitate users to expand into VR experiments. VR equipment and software installation and debugging are not required. |
serial number | name | Device parameters | unit | quantity | Remark |
1 | Evaporation tr*ning device |
1. Tr*ning functions of the evaporation tr*ning device: 1. Completely embodies the typical evaporation separation process. The device meets the understanding, internship and practical tr*ning operation requirements of students majoring in chemical technology, chemical machinery and process control. 2. Examine the effects of heating temperature, feed concentration, feed amount, etc. on the evaporation separation process. 3. Be able to carry out practical tr*ning on the installation, m*ntenance and structural design of typical chemical equipment, and be able to carry out practical tr*ning on the plane and elevation layout and related drawings of typical chemical equipment. 4. Using intelligent instruments, control configuration and control experiments can be carried out, and it has system signal interlock protection function. When abnormal conditions such as overpressure and overtemperature of process equipment occur, the system can alarm in time and automatically stop safely, and control temperature and pressure. , flow and other parameters are monitored. DCS control system can also be used. 5. Master the control principles and schemes of typical equipment such as evaporators, condensers, separators, and pumps. In addition to on-site control of the start and stop of m*n motorized equipment, DCS can also operate, control and display operating status. The m*n process parameters have ground indication function. 6. Examine the operation of typical evaporation separation processes, examine the balance of materials and energy in the system; examine the impact of changes in major factors on the production system, and ensure that it can operate safely and for a long period to meet continuous operation requirements. 7. Film evaporation job skills Tr*ning: heating temperature measurement and control operations; feed concentration and feed amount measurement and control operations; 8. Quality control job skills tr*ning: evaporation concentrate sampling and component analysis operations; concentrate concentration control; 9. Chemical instrument job skills tr*ning: metering pumps, The use of rotameter, frequency converter, differential pressure transmitter, thermal resistor, intelligent instrument, audible and visual alarm, voltage regulating module and various types of local spring pointer meters, etc.; single loop, cascade control and ratio control and other controls Implementation of the plan; 10. Skills tr*ning for local and remote control positions: communication between on-site console instruments and microcomputer, real-time data collection and process monitoring; communication between DCS console in the m*n control room and on-site console, switching of each operating section, remote monitoring, and process Configuration upload and download, etc. 2. Objects of the evaporation unit operation tr*ning device: 1. Frame\st*rs\guardr*ls: frame length×width×height: 3000×1500×3500mm, st*rcase width 700mm. The total installation size of the equipment: 3700×1500×3500mm. The whole machine adopts a steel installation frame (two-layer design, the first floor is convenient for operation, m*ntenance, and access, and the second floor has a safety ramp leading up to it and has guardr*ls and anti-skid pattern plates), anti-rust red primer, and spray p*nt treatment. The m*n frame of the upper and lower platforms uses 8# channel steel, the auxiliary frame uses 4# angle steel, and the four installation pillars use Φ89*3 steel pipes. The platform board uses δ3 lentil-shaped pattern board. The st*r frame has a total of 4# angle steel, and the st*r slab uses δ3 lentil-shaped pattern plate. The guardr*l vertical installation column uses 30×30×δ1.5 square steel pipe, and the horizontal pipe uses Φ25*δ1.5 steel pipe, 1 set; 2. Flange: matched with the corresponding equipment bracket, st*nless steel, 1 set; valve: matched with pipelines and equipment Matching, 1 set; pipeline: matching with equipment, 1 set; 3. Raw material tank: st*nless steel (304), Φ400; 800mm, V=92L, 1 set; 4. Separator: st*nless steel, Φ250×480mm, V=13L, 1 set; 5. Product tank: st*nless steel, Φ300×460mm, V=21L, 1 set; 6. Soda water separator: st*nless steel, Φ100×200mm, V=1.5L, 1 set; 7. Condensate tank: st*nless steel, Φ350 ×780mm, V=65L, 1 set; 8. Oil tank: st*nless steel, Φ400×850mm, V=65L, 1 set; 9. Heater: st*nless steel, Φ350×570mm, heating power P=24kW, 1 set; 10. Preheater: st*nless steel, Φ200×800mm, F=0.26m2, 1 set; 11. Evaporator: st*nless steel, Φ273×2100mm, F=1.1m2, 1 set; 12. Condenser: Φ200×780mm, F=0.26m2 , 1 set; 13. Vacuum buffer tank: Φ300×680mm, V=45L, 1 set; 14. Raw material liquid pump: st*nless steel, magnetic pump (flow rate 30L/h), 1 set; 15. Vacuum pump: rotary vane vacuum pump, 1 set; 16. Thermal oil pump: oil pump, 1 set. 3. Detection sensing and control display instruments of the evaporation operation unit tr*ning device: 1. Temperature: 1.1 Bimetal thermometer, accuracy: 2.5%FS, on-site, 3 units; 1.2 Platinum resistance accuracy: B level, 5 units, and industrial Intelligent multi-channel inspection display D760 Accuracy: 0.2%FS connection display; 1.3 Platinum resistance accuracy: Class B, industrial intelligent controller AH70 Accuracy: 0.2%FS, 1 unit; 1 voltage regulating module; 2. Pressure: 2.1 Pressure Transmitter, accuracy: 1.0%FS, 2 units, connected to the industrial intelligent multi-channel inspection display D760 Accuracy: 0.2%FS; 2.2 Pressure gauge, accuracy: 2.5%FS, local, 2 units; 3. Flow : 3.1 Glass rotor flowmeter, on-site, 1 set; 3.2 Turbine flowmeter, accuracy: 1.0%FS, 1 set; connected to the industrial intelligent flow calculator AI708H accuracy: 0.5%FS for display. 4. Liquid level: 4.1 Differential pressure transmitter: Accuracy: 0.5%FS, 2 units, industrial and industrial intelligent multi-channel inspection display D760 Accuracy: 0.2%FS connection display; 4.2 Glass tube liquid level meter, on-site, 3 units; 5. Fault point: DCS control, 2 units; solenoid valve; 6. Sound and light alarm system: flash alarm, AI-302M, 8 channels, 1 unit. 4. Intelligent instrument electrical console and computer control console: Intelligent instrument electrical console: about 1650X700X1400 steel spray-p*nted piano-type structure on-site instrument electrical console (including instrument, embedded microcomputer position and switch position, and cont*ns DCS access port). The internal leakage protection *r switch and current leakage protector fully consider the personal safety protection; at the same time, each group of strong current output has a knob switch control to ensure the safety of the equipment and convenient operation and control; it is equipped with split-phase indicator light, switching power supply, contact relays, solid state relays, self-locking switches, plastic copper wires, rubber sheathed wires, shielded wires, aluminum alloy trunking, etc. 5. On-site intelligent instrument computer control system: Operator station upper monitoring computer: Brand computer: dual-core 3.0G, memory 4G, hard disk 1T, mouse, keyboard, 3-year warranty, monitor: 19" LCD, Windows operating system, National Alliance Guaranteed, 1 unit; communication network converter: RS485/232 communication converter, 1 unit. 6. Intelligent instrument upper monitoring software: MCGS industrial control configuration software: MCGS5.5 industrial control configuration software platform software, 1 set, upper monitoring software (Using industrial control configuration software as the platform software) 1 set; supporting experimental instruction book, 1 set. |
Wechat scan code follow us
24-hour hotline+86 18916464525
Phone18916464525
ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap