Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

NEWS

NEWS

Elevator well track facilities installation and debug training device

Release time:2024-02-21 19:18viewed:times

Elevator well track facilities installation and debug tr--ning device,Thermal exchanger performance test tr--ning device


1. Product overview

This device is a platform for elevator wells to put and install tr--ning assessment based on the current real elevator well -tract system and m--ntenance needs. Elevator installation and m--ntenance, building automation, mechanical qualification appr--sal centers and tr--ning assessment institutions for elevator installation and m--ntenance, building automation, mechanical and electrical automation, and tr--ning and assessment institutions are suitable for each vocational college and technical schools.

Elevator car disassembly tr--ning device adopts real elevator floor gate, car guide r--l, car rack, car, car door, car buffer, p--r of heavy r--ls, heavy racks, fences, p--rs, p--rs, p--rs For heavy blocks, to entert--n devices and other devices, students use the elevator well tr--l system to design drawings on the top of the analogway and install and measure the well -running equipment in order to meet the requirements of the specifications. The upper and lower motion simulates its operation on the well -track guide and auxiliary inspection of the actual installation quality of the guide r--l.

2. Product characteristics

1. The design of the steel structure elevator well road platform is adopted, and the overall appearance is simple and clear;

2. Follow the modular design concept, and conduct teaching and tr--ning design according to the requirements of the elevator installation process;

3. Use real institutional devices to make students learn consistent with practical applications;

4. Simten to the real environment, make it consistent with the installation process as the actual installation, and can operate its m--ntenance project more conveniently;

5. Adopt a manual gourd dragging the car rack and the movement of the heavy rack on the guide r--l, making the demonstration and debugging more convenient.

6. Genuine elevator car 3D simulation disassembly teaching software


电梯井道设施装配与调试实训装置.jpg


Elevator well track facilities installation and debug tr--ning device,Thermal exchanger performance test tr--ning device


Purpose:


1. Understand the structural characteristics of the plate, the tube, and the heating device of the tube and the heat transfer performance.


2. Master the performance test method of each heat exchanger to understand the factors that affect the performance of the heat exchanger.


3. Deepen the difference in the difference in heat exchanges, two flowing methods: smooth flow and reverse flow.


4. Master the measurement technique of fluid flow, flow, pressure, temperature and other parameters.




M--n configuration:


Set tube heat exchanger, plate heat exchanger, column tube heat exchanger, cold, hot water anticorrosive pump, cold, hot water rotor flowmeter, cold, hot water st--nless steel raw water tank and heating water tank, smooth and inverse regulating valve Group, resistance testing pressure gauge and U -type differential compressionometer, heating power is not adjusted by the solid pressure regulating module, ** signal input inspection instrument display temperature, current meter, voltage meter, st--nless steel tablet, and control screen.




Technical Parameters:


1. Enter power supply: three -phase AC380V ± 10% 50Hz, power 6.5kW.


2. The heat exchanger area: 0.36m2 of the tube heat exchanger, 0.56m2 plate heat exchanger, and 0.21m2 of the suite heat exchanger.


3. Total power heating: 热 6.0kW, heating temperature: ≤80 ℃.


4. Cold and hot water pump parameters: traffic: 20L/min, r--sing: 12m, power: 120W.


DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap