Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

NEWS

NEWS

Advanced Maintenance Electrician Training Desk

Release time:2024-01-25 19:48viewed:times

Advanced M--ntenance Electrician Tr--ning Desk,Comprehensive wiring assessment tr--ning device


I. Overview

** The tr--ning device of m--ntenance and skills tr--ning and assessment is designed according to the requirements of "Workers Level Standards" and "Vocational Skills Appr--sal" issued by the Ministry of Labor and Social Security. "And" ** M--ntenance Electric "textbooks require electrical control lines, and through the tr--ning of PLC programming controllers and frequency frequency speed regulators and corresponding tr--ning modules equipped with the device, quickly master the actual application techniques and operating skills required by the curriculum. Targeted, practical, scientific and advanced, it can meet the requirements of the assessment outline of the middle and ** m--ntenance of the electrician m--ntenance. Ideal device.

2. Device characteristics:

1. Electrical control line components are installed on the installation board as a hanging board. It is convenient to operate, replace it conveniently, facilitates the expansion function or develop new tr--ning. The choice of operation content is typical and practical;

2. The operating table only requires a three -phase and four -line AC power supply, which can be put into use;

3. Control lines for skill tr--ning and small motors that are specially designed can simulate the technical requirements of various electrical drag systems in the factory, and can meet the installation, debugging, fault analysis and exclusion of m--ntenance electricians;

4. The device has voltage and current leakage protectors to ensure the safety of the operator's life;

5. All components are led to the wiring terminal through the wire. Students only need to be wirled on the terminal when the student wiring is conducive to protecting components;

6. Wiring through the wire grooves for process wiring tr--ning.

7. Have a regular and alarm recorder to provide a unified standard for the assessment of students' tr--ning skills.

3. Technical performance:

1. Input voltage: three -phase and four lines (or three -phase and five lines) ~ 380V ± 10% 50Hz

2. Working environment: temperature-10 ~ + 40 ℃ relative humidity <85%(25 ℃) altitude <4000m

3. Device capacity: <1.5kva

4. Weight: 120kg

5. Standard size: 1600 × 700 × 1600mm

6. Leakage protection action current: ≤30mA; leakage protection action time: ≤0.1S.


高级维修电工实训台.jpg


Advanced M--ntenance Electrician Tr--ning Desk,Comprehensive wiring assessment tr--ning device


1. System summary

This system is a building intelligent security wiring tr--ning assessment equipment developed for secondary vocational schools and vocational education and tr--ning institutions. According to the characteristics of the security wiring system in smart building engineering, the system is based on the characteristics of the security wiring system. The installation, wiring and debugging of the system are also designed to strengthen students' capabilities such as installation, electrical wiring, debugging, fault diagnosis and m--ntenance of each module of security wiring systems. It is suitable for the installation and operation of the building's intelligent equipment Professional teaching and tr--ning.

The system uses the building model as the structural foundation, including the two parts: smart building (community) and management center. The smart building (community) can simulate the security room of the smart building, and it can also simulate the security room of the smart community. In this system, project tr--ning can test students' team collaboration ability, planning organization ability, building equipment installation and debugging capabilities, engineering implementation capabilities, occupational literacy and communication ability.

The equipment consolidated by 1 aluminum alloy bracket and 17 mesh plates, and the first floor of the building, the first floor channel, the gate of the first floor, the two -story corridor, the two -story corridor, the two -story corridor, the two -story corridor, the two -story corridor gate, the two -story corridor gate, the two -story channel, the two -story channel, the two -story channel, the two -story channel, the two -story channel door Window, second -floor residents, the door of the second floor, the windows on the second floor, the vertical well and the surrounding buildings. The room provides the installation range of the front and back walls and the top wall, which can be installed on it with various building intelligent devices. At the same time, the door and windows of the room can be installed. Eliminating devices can be installed and operated by various systems of intelligent buildings, such as "intercom and indoor security systems" and "closed -circuit TV monitoring and peripheral security systems". Compared with a single -layer simulation floor, the two -floor simulation floor needs to consider the multi -floor structural relationship of smart buildings. In addition to cultivating students' engineering construction capabilities, it can also cultivate their engineering design capabilities and engineering innovation capabilities, which is in line with the practice of colleges and universities in colleges and universities. Teaching needs.

 

2. System structure and composition

Building intelligent security wiring tr--ning system adopts a modular design, consisting of architectural models, intercombuting subsystems, indoor security subsystems, peripheral defense subsystems, video monitoring subsystems, and patrol subsystems.

The building model consists of standard -specified aluminum alloy industrial profiles and mesh installation boards, with a total power box. The architectural model is divided into two parts: smart building (community) and management center. The smart building (community) has unit doors and single -house windows to achieve engineering tr--ning such as equipment installation of smart communities. Fashion function.

The management center realizes centralized monitoring and management of the security area, and has a typical management equipment such as management center machines, video surveillance cabinets, and monitoring computers.

Install smoke detectors, infrared detectors, glass crushing detectors, vibration detectors, door magnetic, infrared shooting and patrol more in the smart building. The room window of the smart building (community) is equipped with curt--n detectors to achieve indoor security and perimeter prevention functions.

In the management center area and security area, install typical monitoring equipment (hemisphere camera, infrared camera, gun machine, integrated spherical camera, etc.) to achieve key areas of video surveillance. The monitor, the other is a 14 -inch CRT monitor.

Each module in the system can be debugged, run alone, and can conduct linkage tr--ning through wiring and configuration. The functional area is used to implement the system connection.


DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap