Training desk for traffic meter verification

Release time:2023-12-20 12:56viewed:times

Tr--ning desk for traffic meter verification,Microcomputer line protection system experimental device


Feature

1. The entire device is beautiful and generous, the structure is reasonable, and has a strong engineering atmosphere, which can fully reflect the concept of modern laboratories.

2. The equipment layout is reasonable, beautiful, the structure is clear, and the overall sense is strong. It can reflect the concept of the m--n experimental equipment in the laboratory.

3. The equipment is a self -propelled frame structure, and the feet are installed to facilitate the disassembly m--ntenance and handling of the system.

4. Except for special materials, the entire set of equipment is made of 304 st--nless steel for industry. All equipment is finely polished, which reflects the perfectness of the entire device.

5. The experimental system device integrates the school nuclear of the two traffic meters of Wenqili and the pore board flowmeter, so that students can learn the correct flow measurement of flow and understand the correct way of linter.

6. Experimental items can be selected by regulating and switching through valve. The fluid export is full of tube section; the fluid flow is adjusted by the gate valve, the flow measurement of the turbine turbine meter and the digital instrument system;

7. The entire system adopts a standard industrial instrument control system and can perform chemical principles experiments. It is also a good platform for process automation and chemical detection instrument experiments.

8. Device design can be observed at 360 degrees to achieve comprehensive teaching and experiments.

Device function

1. Understand the structure, working principles, and m--n characteristics of the turbine rotation meter, pore board flow meter, Wenqili flowmeter and rotor flow meter.

2. Master the calibration method of traffic meter.

3. Understand the change of the flow of flow meter flow coefficient C Su Su Na Nurue, and the method of determining the flow coefficient C.

4. Learn how to choose the coordinate system reasonably. Learn to calibrate the flow with the method of standard flowmeter.

5. Determine the traffic calibration curve of the throwing flowmeter (hole board, Wenqiuli).

6. Ren the relationship between Renault numbers and flow coefficient C of the throttling flowmeter, and compare it.

7. Determine the flow calibration curve of the rotor flow meter.

8. Integrated control of full touch, high stability data transmission, hardware encryption.


流量计校核实训装置.jpg



Tr--ning desk for traffic meter verification,Microcomputer line protection system experimental device



I. Overview


This device adopts a microcomputer line protection device widely used in modern power engineering, equipped with modules such as power supply, two sections of transmission lines, intestines, and intelligent fault settings. This device m--nly completes the tr--ning of the characteristics of the protection of the characteristics of the protection device, the wiring, the settings, and the operation. It can be used for tr--ning in the power industry, and it can also be used for the assessment of the tr--ning of students related to high school and technical technical schools.


Smart fault settings and large screen LCD questions:


Operating unit


Operating unit circuit board (integrated with display), keyboard.


The operating unit adopts multiple protection design; dual -power DC 12V input; 128x64LCD display; 8th road switch to alarm input, up to 48 -way relay control; the operating unit may not be connected to the offline assessment; the score can be automatically scored;


There are m--nly the following operating functions:


Student entrance: Students can be used when the students are lifted, and they can inquire about the rem--ning time of the assessment.


Teacher entrance: Set up faults, to remove all f--lures, set the assessment time, modify the login password, and set the device number. Teachers need to log in to the password.


Score query: query the current scoring of students.


Learning number query: Query the teacher set by the teacher through the computer.


Equipment number query: Query the device address of the machine, each operating unit has the unique device address.


The assessment time starts: After the teacher setting the assessment time, the assessment starts to count the countdown.


2. Tr--ning assessment project


1. Basic tr--ning program


(1) Simulation system is normal, maximum, and minimum operation


(2) Simulation system short circuit


(3) Basic functional test of microcomputer protection device


(4) Microcarmarking current speed break protection


(5) Microcarmark time limit over current protection


(6) The speed of the time limit of the microcomputer band


(7) Phase current protection


(8) The impact of the operation method on the protection of the protection and sensitivity verification


DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap