Pipeline fork pipe experiment table,New Energy Vehicle Air Conditioning System Tr--ning Device
Technical Parameters:
1. Operating environment: temperature 0-40 ° C, relative humidity: ≤90%RH, power supply: 220V/50Hz, which can be continuously operated.
2. Silent and environmentally friendly pump: Saying: 10m, traffic: 12L/min, power: 90W.
3. Tube: Organic glass material, tube diameter φ32 (inner diameter 26) mm. Fork tube: Tube diameter φ20 (inner diameter 14) mm, L = 70mm, transparent organic glass.
4. Water storage tank, 500 × 400 × 400mm, material PVC board.
5. Measurement of water tank: 10L volume, transparent organic glass, with a measuring scale.
6. The pressure measurement meter is fixed on the pressure measurement rack by 10 organic glass tubes with a diameter of 650mm in diameter of 650mm in diameter. The stubborn ruler is used to facilitate the readings. The indicator liquid in the pressure difference is water, which is non -toxic and the operation is safe.
7. The fluid used in the experiment-water is full circular design, which fully saves water resources.
8. The frame and countertop are made of 304 st--nless steel. The structure is compact, beautiful in appearance, and convenient to operate.
9. Dimensions: 2200 × 580 × 800mm (length × width × height), the frame is a mobile design, with a foot wheel and imprisoned feet.
10. Building building and smart building electrical installation virtual simulation software
Based on the UNITY3D design, users choose different interactive interface size based on the computer configuration. The software in the software can be rotated, magnified, reduced, and translated at 360 °. There are small assistant tips for software use, the content is as follows:
A. Wet alarm system
1. System summary: Overview of Wet Alarm System
2. Equipment cognition: set up the best perspective, equipment det--ls (display the introduction or parameter of the device), practice (built -in 6 selection questions, there are prompts for correctness and errors), schematic diagrams (can be entered from the schematic diagram Go to the device). The equipment includes: nozzle, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, executive pressure gauge, high water tank, Weia control cabinet, stabilization tank, flow switch, end -end water testing device, dr--nage facility, water pump combinations, water pump combination Instruments, hydraulic bells, latencys, wet alarms, butterfly valves, stop valves, fire pumps, safe stabilization valves, fire pools.
Pipeline fork pipe experiment table,New Energy Vehicle Air Conditioning System Tr--ning Device
1. Product introduction
Based on the electric vehicle --r -conditioning system, the device fully demonstrates the composition and working process of the electric vehicle --r -conditioning system.
It is suitable for the teaching needs of the theory and m--ntenance of electric vehicle --r -conditioning systems and m--ntenance.
2. Functional characteristics
1. Real and running electric vehicle --r -conditioning system, fully display the structure and work process of the electric vehicle --r -conditioning system.
2. The electric vehicle power system is used as the power source to drive the --r conditioner compressor. Operate the --r conditioning control panel to realize the working process and working principle of the electric vehicle --r -conditioning system.
3. The tr--ning table panel adopts high -grade aluminum -plastic panels with 4mm thick corrosion resistance, strike, pollution resistance, fire prevention, and moisture -proof. Working principle diagram; tr--nees can intuitively compare the circuit diagram and physical objects, understand and analyze the working principle of the electric vehicle --r -conditioning system.
4. Detective terminals are installed on the tr--ning table panel. You can directly detect the electrical signals of the circuit components of the --r -conditioning system on the panel, such as resistance, voltage, current, frequency signals, etc.
5. The tr--ning countertop is equipped with a high and low pressure gauge, and the inlet and outlet thermometer can be displayed in real time to display the pressure of --r -conditioning pipelines and the parameters of the temperature of the inlet and outlet temperature.
6. The tr--ning desk provides students with practical work platforms such as injection refrigerant and leakage.
7. Equipment detection panel is equipped with countertops on the front base in front, which is convenient for placing data, detection instruments, etc.
8. The bottom of the tr--ning table is welded with steel structure, and the round hand rod is welded on the front/sides. The surface is treated with a spraying process, with a self -locking wheel device. It is flexible, safe, reliable, and durable.
9. Machinery assembly and fitter assembly virtual simulation software: This software is developed based on Unity3D. It can select 6 -level image quality. It has the design and virtual disassembly of the reducer and shaft structure, the design and simulation of common mechanical institutions, institutional resource libraries, institutional resource libraries. Typical mechanical institutions (virtual disassembly of gasoline engines), software is an overall software, which cannot be separate resources.
A. Turbine design and virtual disassembly interface can be selected from turbine sn--l pole cone gear reducer, second -level pilot gear reducer, conical cylindrical gear reducer, coaxial cylindrical gear reducer, cone gear reducer, first -class cylindrical, first -class cylindrical, Gear reducer.
Wechat scan code follow us
24-hour hotline+86 18916464525
Phone18916464525
ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap