Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DY-324 Hydrolysis-Aerobic Biological Treatment Training Platform

Release time:2024-06-29 20:30viewed:times
  • DY-324 Hydrolysis-Aerobic Biological Treatment Training Platform
1. Experimental purpose:
1. Deepen the understanding of this process for "printing and dyeing wastewater" or other wastewater.
2. Master the performance and test technical data of this process operation, and use reliable data in production.
3. Enable operators to improve theoretical and practical knowledge.
2. Experimental principle:
This device adopts A/O biochemical treatment process, which is anoxic acidification and contact oxidation.
After the sewage is removed by the grid radish, it flows into the water distribution tank by gravity (the large amount of water can be stirred by the fan), and then it is pumped and metered into the acidification tank for acidification and hydrolysis. This stage m*nly makes the sewage homogenous. And by using the characteristics of short generation, strong activity and easy reproduction and growth of facultative anaerobic bacteria, the macromolecular structure organic matter that is not easy to degrade is hydrolyzed into small molecules and soluble compounds, the organic matter is initially degraded, and the denitrification is completed at the same time, and the nitrogen pollution is finally eliminated.
The contact oxidation tank is a biological treatment device that m*nly uses the biofilm method and also has the activated sludge method. Through oxygenation and aeration by fans, the organic matter in the sewage is fully in contact with the biofilm in the tank, and the adsorption and degradation functions of aerobic bacteria are utilized to further degrade small molecules and soluble compounds into carbon dioxide and water. The sewage then enters the vertical flow secondary sedimentation tank to remove the flaked biofilm and activated sludge so that the effluent can meet the discharge standards.
3. M*n technical indicators and parameters: (reference):
1. Ambient temperature: 5-40℃
2. Processed water volume: 15-30L/h
3. Influent: CODcr 300-500mg/L effluent: 30-50 mg/L
4. Influent: BOD5 100-250 mg/L effluent: 15-30 mg/L
5. Influent: SS 100-200 mg/L effluent: 15-30 mg/L
6. Influent: pH value: 6.5-8.5 effluent: 6.5-8.5
7. Working power supply 220V, safety protection: with grounding protection, leakage protection, overcurrent protection;
8. Electrical line installation requirements: arrange the cable trough, and the power line, control line and other wires are standardized and arranged with insulation, arc protection and other characteristics;
9. Device dimensions: 1600mm×700mm×1900mm.
10. Working power supply: AC220V±10%, 50Hz, single-phase three-wire system, power 1100W, safety protection: with grounding protection, leakage protection, overcurrent protection,
IV. M*n configuration:
1. 1 raw water tank: white PP board material, thickness 10mm, 500×400×500mm, with a dr*n valve installed on the bottom plate to dr*n the water;
2. 1 clean water tank: white PP board material, thickness 10mm, 400×350×400mm, with a dr*n valve installed on the bottom plate to dr*n the water;
3. Equipped with 1 raw water tank stirring motor and 1 set of 304 st*nless steel stirring paddles; (power 15W, speed 120rpm), (including 1 speed regulator), 4. 1 set of hydrolysis acidification tank, transparent organic glass material, wall thickness 10mm, 500×500×650mm, with microporous aeration device (with 1 batch of semi-soft fillers)
5. 1 set of biological aeration column (with Ø38 round ball filler), transparent organic glass, wall thickness 7mm, Ø200×1800mm, with microporous aeration device;
6. 1 vertical flow secondary sedimentation tank, transparent organic glass, wall thickness 7mm, Ø300×400mm;
7. 1 anti-corrosion lifting magnetic water pump, flow rate: 16~19 (L/min), head: 2.7~3.4 (m), power 20W;
8. 1 304 st*nless steel lifting water pump (including backwash), flow rate: 1m3/n), head: 15 (m), power 370W;
9. 1 *r compressor (power supply 220V, power 750W, maximum gas volume: 36L/min, gas volume 30L);
10. Flow measurement and regulation: 1 water inlet flow meter (LZS-15, range 6~60L/h)
11. Flow measurement and regulation: 1 gas flow meter (LZB-10, range 250~2500L/h)
12. Power control system: 1 double-sided matte dense spray plastic electric control box, leakage protector (Delixi brand), voltmeter, lockable button switch, wire pipe, etc.
13. Matching UPVC connecting pipes and valves (Zhongc* brand). 14.
St*nless steel frame test bench (30mm×30mm st*nless steel square tube, equipped with casters for universal wheels with locking feet), etc.
15. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interface according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, the contents are as follows: A. Wet alarm system 1. System overview: Overview of the wet alarm system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (6 built-in multiple-choice questions, with prompts for correct and wrong choices), schematic diagram (you can enter the device from the schematic diagram). The equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pipe pressure gauge, high-level water tank, weiya control cabinet, pressure regulating tank, flow switch, end water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water tank. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model
Translucent, you can see the internal water flow. Equipped with a practice module (4 built-in multiple-choice questions, both correct and wrong choices have prompts)
4. Design layout: There are multiple-choice questions and calculation questions, each question has a score, and the correct answer and score will be displayed after submission
B. Gas fire extinguishing system
1. System overview: Overview of gas fire extinguishing system
2. Equipment cognition: There are optimal viewing angles, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices have prompts), schematics (you can enter the equipment from the schematics). The equipment includes: nozzles, HFC-227 storage bottles, bottle head valves, heptafluoropropane check valves, high-pressure hoses, gas check valves, safety valves, weighing alarms, electromagnetic starters, selector valves, smoke alarms, and fire alarm controllers.
3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model translucent, you can see the internal gas. Equipped with practice module (built-in 3 multiple-choice questions, with prompts for correct and wrong choices)
4. Design and layout: There are 6 multiple-choice questions, each with scores, and the correct answer and score will be displayed after submission
. C. Escape drill: Teaching in the form of fun games, escape from the burning room within a limited time, and wrong choices will directly enter the score interface.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap