Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYDT-WM universal elevator door system installation experimental platform

Release time:2024-06-27 17:30viewed:times
  • DYDT-WM universal elevator door system installation experimental platform
1. Equipment Overview
The door system installation tr*ning platform is a tr*ning platform suitable for the installation of various elevator door systems, developed based on the elevator installation process and m*ntenance requirements, combined with the door system structure of the current elevator market. It is suitable for elevator installation and m*ntenance, building automation, electromechanical automation and other elevator-related majors in various vocational colleges and technical schools, as well as professional qualification appr*sal centers and tr*ning and assessment institutions .
The entire device consists of a fixed frame, a mobile frame, a floor door system, and a car door system. The unique design allows the floor door and the car door to be installed separately and independently, and the mobile frame can be combined to realize the linkage between the car door layer and the floor door. It enables students to intuitively understand the structure of the elevator door system, more effectively help students master its working principle, and more conveniently carry out actual installation and m*ntenance.
2. Product Features
1. It adopts a steel structure frame platform design, and the overall appearance is simple and clear;
2. It follows the modular design concept and is designed in a teaching and tr*ning style according to the requirements of the elevator installation process;
3. It adopts a horizontal movement method to enable the floor door and the car door to be installed and debugged in a mobile manner;
4. It is suitable for the installation of various elevator door systems.
3. Technical parameters
1. Machine weight: ≥4000kg;
2. Dimensions: 4780mm×3700mm×3510mm (length×width×height);
3. Frame travel: 1440mm;
4. Frame corridor width: 60mm;
5. Door installation range: suitable for installation of various elevator doors.
6. Virtual simulation system for comprehensive integrated tr*ning of professional skills The model
in the software can be rotated 360°, enlarged, reduced, and translated, and has universal interactive buttons: return, home page, help. There are prompts for all virtual simulation task processes, and the software automatically ticks after completing a task. There are experimental tasks 1 and basic solids above the tool library ( the XYZ space coordinate icon automatically rotates with the rotation when the model is rotated.) A. Plane solids: The experimental steps are divided into experimental tasks (text prompt tasks) - build models (drag the model in the tool library to the three-projection surface system, and the projection will be automatically displayed. There will be prompts when the selection is wrong) - change posture (change by clicking the up, down, left, and right arrows) - select projection (enter the answering interface, and select the three-dimensional projection diagram completed at this time from the 6 items) B. Cutting solids: The experimental steps are divided into experimental tasks (text prompt tasks) - build models (drag the model in the tool library to the three-projection surface system, and the projection will be automatically displayed) - mark the projection situation (mark the three-dimensional projection diagram, and select the corresponding marking symbol in the 14 blank columns) C. Intersecting solids: The experimental steps are divided into experimental tasks (text prompt tasks) - digging holes (select any digging hole model, then you can select any surface in the XYZ space coordinates, the models will switch at the same time, and a coordinate slider will appear. According to the displacement of the slider, the model will have a corresponding degree of cross-section) - aperture change (select 1-4 apertures) - rear through hole - select projection (enter the answering interface, and select the completed three-dimensional projection diagram at this time in 8 items) 2. Assembly A. Assembly assembly: The experimental steps are divided into experimental tasks (text prompt tasks) - select the assembly model (8 models can be selected) - assemble the assembly (select the tool library model according to the selected model and drag and drop the assembly) - section the assembly (you can select any surface in the XYZ space coordinates, the models will switch at the same time, and a coordinate slider will appear. According to the displacement of the slider, the model will have a corresponding degree of cross-section) - select side projection (enter the answering interface, based on the known front and horizontal projection diagrams, select the correct side projection diagram in 3 items) B. Assembly drawing reading: The experimental steps are divided into experimental tasks (text prompt tasks) - select the assembly section view (8 types of drawings can be selected) - build the assembly model (select the tool library model according to the selected model and drag and drop the combination) - cut the assembly (you can select any surface in the XYZ space coordinates, the model will switch at the same time, and a coordinate slider will appear. According to the displacement of the slider, the model will appear with a corresponding degree of section) - select the left view (enter the answer interface, according to the known m*n view and top view, select the correct left view from the 3 items) 3. Assembly A. Mechanical transmission mechanism : 8 mechanisms (worm gear, gear rack, spiral transmission, plane external meshing gear, plane internal meshing gear, space spur bevel gear, belt drive , ch*n drive) are optional. After selecting, the model will appear in the toolbar. Drag the model freely to combine. After the combination is completed, the model can be operated. Each mechanism comes with an introduction, video demonstration, and drawing method. There are 6 questions in the answer interface, and each question has 4 options. B. Gear oil pump: Select the tool library model according to the prompts and build the model step by step. You can choose to learn the introduction, drawing method, and animation principle (the internal movement principle of the model can be visualized). There are 2 questions in the answering interface, and 4 options for each question. C. Mechanical mechanism construction: 2 mechanisms (2-DOF robotic arm, 3-DOF robotic arm). Select the tool library model according to the prompts and build the model step by step. After the combination is completed, the model can be operated. Each mechanism comes with an introduction and video demonstration. There are 2 questions in the answering interface (both models must be built before entering), and 4 options for each question. IV. Configuration list












Serial number name quantity unit Remark
1 Fixed frame 1 tower  
2 Mobile Frame 1 tower  
3 guide 3 strip  
4 Travel limit seat 6 indivual  
5 Positioning seat 4 indivual  
6 Floor door mounting bracket 2 indivual  
7 Car door mounting bracket 2 indivual  
8 Side-opening landing door 1 set St*nless steel door leaf
9 Side-opening car door 1 set St*nless steel door leaf
10 Center split landing door 1 set St*nless steel door leaf
11 Center split car door 1 set St*nless steel door leaf
12 Side-opening door operator 1 set  
13 Center-type gantry crane 1 set  
14 Door sill 2 strip  
15 Car door threshold 2 strip  
16 Side-opening landing door sill 1 set  
17 Center split door sill 1 set  
18 Side-opening door frame 1 set St*nless steel
19 Center split door frame 1 set St*nless steel
20 Door Knife 2 set  
twenty one Installation Tools 1 set Level, plumb bob, wrench, screwdriver, measuring tape, hammer, etc.
twenty two Random Information 1 share Tr*ning instructions and related drawings, etc.
5. Practical tr*ning course content
Installation and adjustment of side-opening landing door sill;
installation and adjustment of side-opening door frame;
installation and adjustment of side-opening landing door
sill; installation and adjustment of side-opening landing door leaf;
adjustment of landing door lock;
installation and adjustment of side-opening door machine mechanism;
installation and adjustment of side-opening car door; installation and adjustment of
door knife; installation and adjustment of
center-split landing door sill;
installation and adjustment of center-split door frame; installation
and adjustment of center-split landing door sill;

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap