Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DY-525 Electric Defogger Training Device

Release time:2024-06-22 04:00viewed:times
  • DY-525 Electric Defogger Training Device
1. Principle, use and characteristics:
The dust removal principle of the electrostatic precipitator is to charge the dust particles in the dust-cont*ning gas in the high-voltage electrostatic field. Under the action of the electric field, the charged dust particles tend to the dust collecting electrode. The negatively charged dust particles adhere to the surface of the dust collecting electrode after contacting the dust collecting electrode. A small number of charged dust particles are deposited on the discharge electrode with a small cross-section. Then, the dust collecting electrode is shaken with the help of a vibration device to shake off the dust particles and drop them into the dust collecting hopper of the dust collector to achieve the purpose of dust collection. The plate-type electrostatic precipitator model has a high dust removal efficiency, is suitable for teaching use, is easy to operate, and is convenient for demonstration. Its characteristics: The dust collector has uniform *rflow; the shell structure and vibration dust removal are simple; it can handle a wide range of smoke particles; it has good adaptability to the dust concentration of smoke; it has low pressure loss; it has low energy consumption; it is resistant to high temperature and corrosion; it has high capture efficiency; it is easy to control automatically; it has low operating costs; it is convenient for m*ntenance and management.
2. M*n technical parameters and indicators:
1. Ambient temperature: 5℃~40℃
2. Electric field voltage: 0~30KV
3. Processing gas volume: 50-250m3/h
4. Demisting efficiency: about 90%
5. Effective driving speed of corona electrode: 10cm/s
6. Wind speed of electric field section: 0.8-1m/s
7. Number of channels: 6
8. Pressure drop: <200Pa
9. Water content of atomized gas: <50g/m3
10. Overall dimensions of electric demister: length 600mm×width 500mm×height 1200mm
11. Overall dimensions of device: length 2200mm width 500mm height 1700mm
12. Working power supply: AC220V±10%, 50Hz, single-phase three-wire system, power 2000W; Safety protection: with grounding protection, leakage protection, overcurrent protection;
13. Installation of power lines and control lines: Environmentally friendly flame -retardant electrical wiring ducts must be used, which are standardized and organized in accordance with national standards, have insulation and other characteristics, neat wiring, reliable installation, and are easy to find, rep*r and replace lines;
III. M*n configuration:
1. 1 set of electric demister: made of transparent organic glass, 10mm thick, including accessories: 6 dust collecting electrodes, 6 discharge electrodes, 1 set of dr*nage troughs,
2. 1 set of high-voltage electric fog generator: including 1 transformer, which can display voltage and current, with small ripple, low energy storage, high stability and high reliability. When the load end is short-circuited, the power supply has the function of automatic power-off reset and output voltage clearing, which can better protect life safety and increase the service life of equipment;
3. 1 ultrasonic atomizer,
4. 1 set of gas-dust static mixer: a box-type static mixer is used;
5. 2 groups of manual monitoring inlets and outlets, 2 groups of pressure measuring points, and 1 batch of transparent pressure measuring hoses;
6. 1 set of automatic feeding device for organic glass dust, 1 set of organic glass dust removal device;
7. 1 centrifugal fan: (voltage: 220V, power 1.1Kw, speed 2900r/min),
8. 1 set of inverter: control the fan torque to adjust the *r volume;
9. Power control system: 1 double-sided matte dense spray plastic electric control box, leakage protector (Delixi brand), self-locking button switch with light,
10. Ø 110 connecting pipes and control ball valve
11. St*nless steel frame test bench (38mm×38mm st*nless steel square tube, equipped with casters are all universal wheels with locking feet) and other components.
12. Virtual simulation software for electrical installation of building and intelligent building Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, the contents are as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematic diagrams (you can enter the equipment from the schematic diagram). The equipment includes: sprinklers, water flow indicators, signal butterfly valves, exhaust valves, fire alarm controls, high-pressure gauges, high-level water tanks, Wia control cabinets, pressure-stabilizing tanks, flow switches, terminal water testing devices, dr*nage facilities, water pump connectors, hydraulic alarms, time delays, wet alarms, butterfly valves, check valves, fire pumps, safety pressure-stabilizing valves, and fire water tanks. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, and semi-transparent 3D models, so that the internal water flow can be seen. Equipped with practice module (4 multiple-choice questions built in, with prompts for correct and wrong choices) 4. Design layout: There are multiple-choice questions and calculation questions, each of which is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment recognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), practice (8 multiple-choice questions built in, with prompts for correct and wrong choices), and schematic diagram (you can enter the equipment from the schematic diagram). The equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane check valve, high-pressure hose, gas check valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire alarm controller. 3. Principle display: Display the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model translucent, you can see the internal gas. Equipped with practice module (3 multiple-choice questions built in, with prompts for correct and wrong choices) 4. Design layout: There are 6 multiple-choice questions, each of which is scored, and the correct answer and score will be displayed after submission
C. Escape drill: Teaching in the form of fun games, escaping from the burning room within a limited time. If you make a mistake, you will directly enter the score interface.
Similar products:
ZR-525-II
Data Acquisition Electric Defogger Experimental Device
M*n parameters and configuration:
electric field voltage: 0~20KV (adjustable), device dimensions: length 2200mm width 500mm height 1700mm, power supply voltage: 220V power 1700W, configuration: 1 set of microcomputer concentration detection, 1 set of wind pressure detection, 1 set of 11-inch color LCD touch screen, 1 set of data processing and analysis system, 1 communication interface, 1 set of online temperature and humidity detection, 1 set of micro printer, 1 set of organic glass electric demister, 1 set of ultrasonic atomizer, 6 discharge electrodes, 6 dust collecting electrodes, 1 high-voltage electric mist generator, 1 transformer, 1 set of gas-dust mixer, 1 set of dr*nage trough, 1 set of automatic dust feeding device, 1 set of dust removal device, 1 centrifugal fan, 1 set of st*nless steel *r volume regulating valve, 1 electric control box, leakage protection switch, push button switch, 1 batch of Ø 110PVC connecting pipes, st*nless steel bracket with movable wheels, etc.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap