Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

DYHGGY-22 Liquid Membrane Separation Training Platform

Release time:2024-06-16 02:30viewed:times
  • DYHGGY-22 Liquid Membrane Separation Training Platform
Device function:
1. Master the operation process of liquid membrane separation technology.
2. Understand two different liquid membrane mass transfer mechanisms.
3. Use liquid membrane separation technology to remove pollutants from wastewater.
M*n configuration:
tachometer, AC parallel motor, mass transfer kettle, high-speed dispersing homogenizer, raw material tank, high-quality aluminum alloy profile frame
Utilities:
Electricity: voltage AC220V, power 1.0KW, standard single-phase three-wire system. Each laboratory needs to be equipped with 1 to 2 grounding points (safety ground and signal ground).
Experimental material: acetic acid wastewater
Technical parameters:
1. Operating environment: temperature 0-40℃, relative humidity: ≤90%RH, power supply: voltage: 220V; current: 15A.
2. High-speed dispersing homogenizer: 200-14000rpm; stirring kettle speed: 0-500r/min; experimental results: acetic acid removal rate: 70%.
3. Milk homogenizer: speed range: 1000~14000 r/min, milk kettle volume 500ml, the milk kettle installation lifting platform at the bottom of the homogenizer can be upgraded and adjusted, installed on the left side of the table.
4. Mass transfer stirring kettle: motor speed range: 20~1400 r/min. Mass transfer kettle volume: 1000ml, hard glass material, the bottom is made into an arc to prevent corners from caking and easy to clean, the feeding port on the top of the kettle is 50mm away from the stirring shaft, the stirring blade is anchor frame type, installed on the right side of the table. Quantity 1.
5. Raw material tank: 2L, hard glass material, quantity 1.
6. The instrument cabinet is 304 st*nless steel with plastic spray inside and outside.
7. Chint Electric: contactor, switch, leakage protection *r switch.
8. Pipes, pipe fittings and valves are all 304 st*nless steel.
9. Dimensions: 1200×500×1700mm (length×width×height), movable design, with brake wheels, high-quality aluminum alloy frame, no welding points, easy installation and disassembly, horizontal adjustment support casters.
10. Engineering identification: including equipment position number, pipeline flow arrow and identification, valve position number and other engineering equipment concept matching, so that students are in a safe experimental operation environment, learn to recognize engineering pipeline identification, and cultivate students' engineering concept. 11. Virtual simulation software for electrical
installation of building buildings and intelligent buildings Based on unity3d design, users can choose different sizes of interactive interfaces according to computer configuration, and can choose six levels of image quality. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment recognition: It has the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 6 multiple-choice questions, with prompts for correct and wrong choices), and schematics (you can enter the equipment from the schematics). Equipment includes: sprinkler, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pressure gauge, high-level water tank, Weiya control cabinet, pressure regulating tank, flow switch, terminal water test device, dr*nage facilities, water pump connector, hydraulic alarm, delay, wet alarm, butterfly valve, check valve, fire pump, safety pressure regulating valve, fire water pool. 3. Principle display: Display the working principle of the wet alarm system, 3D animation demonstration, 3D model is semi-transparent, and the internal water flow can be seen. Equipped with exercise module (4 built-in multiple-choice questions, both correct and wrong choices are prompted) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score are displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment cognition: It is equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (8 built-in multiple-choice questions, both correct and wrong choices are prompted), and schematic diagram (you can enter the equipment from the schematic diagram). Equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, HFC-227 one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selector valve, smoke alarm, fire alarm controller. 3. Principle display: Demonstrate the working principle of the gas fire extinguishing system, 3D animation demonstration, 3D model is semi-transparent, and the internal gas can be seen. Equipped with practice module (3 built-in multiple-choice questions, with prompts for correct and wrong choices) 4. Design layout: There are 6 multiple-choice questions, each with scores, and the correct answer and score will be displayed after submission. C. Escape drill: Teaching in the form of fun games, escape from the burning room within a limited time, and wrong choices will directly enter the score interface.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap