Shanghai Daiyu Education Equipment Manufacturing Co., Ltd.
Language:

PRODUCT

PRODUCT CENTER

dyHGRG-49 air heater performance training device

Release time:2024-06-11 20:30viewed:times
  • dyHGRG-49 air heater performance training device
Technical parameters:
1. Input power supply: three-phase AC380V±10% 50Hz, power 5.5KW.
2. Fin *r-cooled condenser, heat exchange area 3.0m2, 40W cooling fan. Fin tube heat exchangers are copper tubes strung together with aluminum fins.
3. St*nless steel heating water tank, volume 60L, heating power 4.0KW.
4. Circulating hot water pump parameters: flow: 20L/min, head: 12m, power: 120W. Flow meter range 40-400L/h.
5. Centrifugal fan parameters: *r volume 2000 m3/h, wind pressure 1000 Pa, power 1.5KW.
6. The experimental *r duct is made of 304 st*nless steel and is divided into *r outlet section, experimental section, test section, etc., which are connected with flange nuts.
7. The temperature is measured by a high-precision temperature sensor , a universal signal input inspection instrument and a high-precision digital display meter, which display all experimental measurement parameters such as temperature, resistance, flow rate, power, etc., and the manual damper adjusts the *r volume.
8. Dimensions: 2500×500×1600mm. The shape is a st*nless steel movable bracket with double brake wheels.
9. Virtual simulation software for electrical installation of building buildings and smart buildings. Based on unity3d design, users can choose different interactive interface sizes according to computer configuration, and six levels of image quality are av*lable. The model in the software can be rotated 360°, enlarged, reduced, and translated. There are assistant prompts during the use of the software, and the content is as follows: A. Wet alarm system 1. System overview: Overview of wet alarm system 2. Equipment awareness: equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), and exercises (Built-in 6 multiple-choice questions, prompts for correct and incorrect choices), schematic diagram (can be entered into the device from the schematic diagram). Equipment includes: nozzle, water flow indicator, signal butterfly valve, exhaust valve, fire alarm control, high pipe pressure gauge, high water tank, Wia control cabinet, pressure stabilizing tank, flow switch, terminal water testing device, dr*nage facilities, water pump connection alarms, hydraulic alarms, delayers, wet alarms, butterfly valves, check valves, fire pumps, safety pressure regulators, and fire pools. 3. Principle display: Show the working principle of the wet alarm system, three-dimensional animation demonstration, the three-dimensional model is translucent, and the internal water flow can be seen. Equipped with a practice module (built-in 4 multiple-choice questions, with prompts for correct and incorrect choices) 4. Design layout: There are multiple-choice questions and calculation questions, each question is scored, and the correct answer and score will be displayed after submission B. Gas fire extinguishing system 1. System overview: Overview of gas fire extinguishing system 2. Equipment awareness: equipped with the best viewing angle, equipment det*ls (displaying the introduction or parameters of the equipment), exercises (built-in 8 multiple-choice questions, with prompts for correct and incorrect choices), Schematic diagram (access to the device from the schematic diagram). Equipment includes: nozzle, HFC-227 storage bottle, bottle head valve, heptafluoropropane one-way valve, high-pressure hose, gas one-way valve, safety valve, weighing alarm, electromagnetic starter, selection valve, smoke alarm, fire Alarm controller. 3. Principle display: Show the working principle of the gas fire extinguishing system, three-dimensional animation demonstration, the three-dimensional model is translucent, and the internal gas can be seen. Equipped with a practice module (built-in 3 multiple-choice questions, with prompts for both correct and incorrect choices) 4. Design and layout: There are 6 multiple-choice questions, each question is scored, and the correct answer and score will be displayed after submission. C. Escape drill: adopted Teaching is conducted in the form of fun games. Escape from the burning room within a limited time. If you make a wrong choice, you will directly enter the score interface. Purpose of the experiment: To conduct fin-tube heat exchange, test the heat transfer coefficient and resistance when the inside of the heat exchanger is hot water and the outside is *r. M*n configuration: circulating anti-corrosion water pump, rotor flowmeter, *r-cooled condenser, finned tube heat exchanger, wind tunnel experimental section, multi-wing low-noise centrifugal fan, automatic adjustment damper, flute tube and differential pressure wind speed measurement device , the heating is steplessly adjusted by the solid pressure regulating module, which controls the test instrument box, the st*nless steel heating water tank, and the 8-channel universal signal input inspection instrument displays the temperature, water and wind resistance and wind speed.

DAIYUWechat scan code follow us

  • 24-hour hotline+86 18916464525

  • Phone18916464525

 ADD:Factory 414, District A, No. 6, Chongnan Road, Songjiang Science and Technology Park, Shanghai ICP: Sitemap